期刊文献+

Preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge 被引量:17

Preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge
原文传递
导出
摘要 The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented. The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented.
出处 《Science China(Technological Sciences)》 SCIE EI CAS 2010年第2期502-511,共10页 中国科学(技术科学英文版)
基金 supported by the National Hi-Tech Research and Develop-ment Program of China ("863" Project) (Grant No. 2006AA11Z120)
关键词 PARTIALLY earth-anchored CABLE-STAYED BRIDGE preliminary design PARAMETRIC study partially earth-anchored cable-stayed bridge preliminary design parametric study
  • 相关文献

参考文献1

二级参考文献4

  • 1TDV,2003,RM-Spaceframe Users Manual,rev8.58-02. 被引量:1
  • 2苗家武 裴岷山 徐利平.苏通大桥主航道桥几何非线性影响比较研究[C]..中国公路学会桥梁与结构工程学会桥梁学术会议论文集[C].中国成都:人民交通出版社,2003.. 被引量:2
  • 3Janjic D,Pircher M,Pircher H.Optimisation of Cable Tensioning in Cable-Stayed Bridges[J].Journal of Bridge Engineering,ASCE,2003,8 (3):131-137. 被引量:1
  • 4同济大学桥梁系.苏通长江公路大桥主桥斜拉桥结构非线性影响分析研究报告[R].上海:同济大学,2004.. 被引量:1

共引文献11

同被引文献105

引证文献17

二级引证文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部