摘要
由于钻孔灌注桩施工的隐蔽性和不可预见性,施工工艺复杂,质量较难控制,文章运用三阶段质量控制原理,结合钻孔灌注桩施工工艺特点,详细分析和论述了事前、事中和事后施工质量控制要点。
Because of the hidden nature and unpredictability of bored piles construction,complexity of construction technology,difficulty in quality control,this article use the principle of three-stage quality control,combined with the characteristics of bored pile construction technique,a detailed analysis and discussion are done for the construction quality control.
出处
《建筑监督检测与造价》
2009年第4期37-39,共3页
Supervision Test and Cost of Construction
关键词
钻孔灌注桩
施工
质量控制
事前控制
bored pile
construction
quality control
advance control