摘要
平均间隙法(Hannover-法)是监测网基准点稳定性检验的主要方法。本文在新安江大坝三期水准网观测数据的基础上,运用平均间隙法进行了基准点稳定性检验,结果表明坝区二等水准网基准点稳定性良好,并对后期监测提供了一定的建议。
The average gap method(Hannover-method)is the main method of leveling network benchmark stability test.Basing on the three period of Xin'anJiang Dam leveling network observational data and using the average gap method to benchmark stability test,the results show that the stability of the second leveling network benchmark in the dam area is good,and a certain amount of recommendations provides for post-monitoring.
出处
《水电自动化与大坝监测》
2014年第3期22-24,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
新安江大坝
水准网基准点
平均间隙法
稳定性检验
Xin'anJiang Dam
leveling network benchmark
average gap method
stability test