期刊文献+

玉门镇西戈壁铁路防沙林带林沿积沙及其防治试验 被引量:1

THE ACCUMULATION OF SAND AND ITS PREVENTION AND CURE ALONG THE FRONT OF SHELTER BELT OF THE RAILWAY ON GOBI WEST OF YUMEN TOWN
下载PDF
导出
摘要 本文是玉门镇西戈壁铁路防沙林带林沿积沙防治试验的总结。研究当地风沙与林沿积沙特征,制定外堵西风口以断沙源、内引东风以退积沙的措施。经过1971—1977年的试验,证实效果良好。 This paper is a summary of the accumulation of sand along the front of shelter belt of the railway and its experiment of prevention and cure.It is a region from southeast K905 to northwest K909 of the railway on gobi west of Yumen town. It is located in the alternative region of the west and east wind, but the west wind is stronger and it prevails longer. On the left of the railway there is broad gobi with soil, and at the far west there is the former wood belt from south to north but it breaks and leaves a gap toward the west (west wind gap) near the railway. Outside the gap is a mobile survived mound of soil erosion and a sand drift. Therefore, the sand accumulates only along the wood belt at the left front of the railway, and the western section is more serious than the eastern one. The east wind can restrict the sand accumulation but can’t stop its intrusion to the wood belt.The accumulation of sand is caused by the sand wind stopped by the wood, and the wind velocity near the surface decreases fast. However, to keep the wood growing this wood belt must be often irrigated. The sand accumulation makes great damages, because it destroys the shelter belt and approaches to the railway, a threast to the trasportation. So it must be prevented and cured, and emphsis must be put on the sand accumulation of the western section. The plan of prevention and cure is as a whole made of two steps, that is to block the west gap and to withdraw the sand.The former step is to keep the west section of this belt in good condition to extend it to K900-500, and to build two wood belts to block the west gap. Before the wood belt on the west side must be established on area of solid sand barrier, ditch and dike of sand prevention, and the bush belt. After it is established, it prevents the sand intrusion to the wood belt. Unfortunately, according to the investigation of 1976, this prevention and protection area has been detroyed, and the sand drift has instruded to the wood belt. It is necessary to reestablish the area of preventi
作者 耿宽宏
出处 《地理研究》 1985年第1期42-53,共12页 Geographical Research
  • 相关文献

同被引文献19

  • 1哈斯.腾格里沙漠东南缘沙丘表面风沙流结构变异的初步研究[J].科学通报,2004,49(11):1099-1104. 被引量:50
  • 2邹学勇,刘玉璋,吴丹,董光荣.若干特殊地表风蚀的风洞实验研究[J].地理研究,1994,13(2):41-48. 被引量:23
  • 3邹学勇,董光荣,王周龙.戈壁风沙流若干特征研究[J].中国沙漠,1995,15(4):368-373. 被引量:38
  • 4АИ兹纳门斯基(杨郁华译).沙地风蚀过程的实验研究及沙堆防止问题[M].北京:科学出版社,1960:852. 被引量:1
  • 5McKenna Neuman C. Particle transport and adiustments of the boundary layer over rough surfaces with an unrestricted,upwind supply of sediment[J]. Geomorphology, 1998,25 : 1 -- 17. 被引量:1
  • 6Zhang Weimin. The gobi sand stream and its control over the top surface of the Mogao Grottoes,China[J]. Bulletin of Engineering Geology and the Environment, 2004,63 : 261 -- 269. 被引量:1
  • 7Steven H W,Jeffrey A L. Aeolian saltation transport rate: an example of the effect of sediment supply[J]. Journal of Arid Environments, 1995,30 : 153-- 160. 被引量:1
  • 8Illenberger W K,Rust I C. A sand budget for the Alexandria coastal dunefield, South Africa [J]. Sedimentology, 1988, 35 (3):513--521. 被引量:1
  • 9Sarre R D. Evaluation of aeolian sand transport equations using intertidal zone measurements, Saunton Sands, England [J]. Sedimentology, 1988,35 (4) : 671 -- 679. 被引量:1
  • 10Bagnold R A. The physics of blown sand and desert dunes [M]. New York: Morrow and Company, 1941 : 167-- 171. 被引量:1

引证文献1

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部