电厂取水口的泥沙淤积对电厂今后的安全运行至关重要,需要对取水口的位置进行合理的规划。结合华能江津油溪电厂一起新建工程取水工程,通过物理模型试验,分析了天然情况下和小南海建成后江津电厂取水口河段泥沙淤积及分布情况以及泥沙淤积对取水口的影响。结果表明:取水口附近河段河势稳定,取水条件较好。
Sediment deposition of power plant water-intake is essential to the safe operation of power plants.So it is necessary to carry out a reasonable plan for the location of the intake.Combining with the construction of power plant water intake project of Huaneng Jiangjin along Oil Creek,the sediment deposition and its distribution as well as the impact of sediment deposition on the water-intake both before and after the completion of Xiaonanhai Reservoir,were analyzed through physical model test.The results indicate that the river regime of the water intake is stable,and the water intake qualification is well.
出处
《重庆交通大学学报(自然科学版)》
CAS
北大核心
2013年第5期1035-1039,1085,共6页
Journal of Chongqing Jiaotong University(Natural Science)
关键词
模型试验
取水口
泥沙淤积
小南海
model test
water intake
sediment deposition
Xiaonanhai