长江小南海枢纽施工二期导流明渠通航条件研究 被引量:2

Diversion Channel Navigation Condition in Construction Phase Ⅱ of Xiaonanhai Water Control Project on Yangtze River
下载PDF
导出
摘要 根据小南海枢纽河段河势及水流条件特点,通过水工模型试验和船模试验相结合的方法,分析了小南海枢纽施工二期导流明渠通航条件及存在问题,提出了明渠进口段炸除碍航礁石、出口段开挖新航槽的优化方案。研究表明:导流明渠原设计方案明渠进、出口段礁石碍航严重,通航水流条件差;优化方案通过整治措施显著改善了导流明渠的通航条件,保障了小南海枢纽施工二期长江上游航运的安全畅通。 According to river regime and flow condition characteristics of Xiaonanhai Water Control Project reach,diversion channel navigation condition and existing problems in construction phase Ⅱ are studied by hydraulic model and ship-model test.Generally,navigation flow condition is bad because of the rocks at the import and export section of diversion channel in original diversion channel design,and has been significantly improved in optimization scheme by regulation the import and export section of diversion channel and excavation new channel.
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2013年第2期306-309,共4页 Journal of Chongqing Jiaotong University(Natural Science)
基金 交通运输部西部交通建设科技项目(2008 328 000 20)
关键词 小南海枢纽 施工二期 导流明渠 通航水流条件 Xiaonanhai Water Control Project construction phase Ⅱ diversion channel navigation flow condition
  • 相关文献

参考文献8

  • 1戴昌军;钱俊;李安斌.重庆长江小南海水电站可行性研究阶段航运专题报告(咨询稿)[R]武汉:长江勘测规划设计研究有限责任公司,2012. 被引量:1
  • 2何进朝;林江;母德伟.渝黔铁路扩能改造工程新白沙沱长江四线特大桥通航净空尺度和技术要求论证研究报告[R]重庆:重庆西南水运工程科学研究所,2009. 被引量:1
  • 3杜宗伟;李霞;张绪进.长江小南海枢纽通航条件关键技术研究报告[R]重庆:重庆西南水运工程科学研究所,2012. 被引量:1
  • 4杜宗伟;张绪进;母德伟.三峡工程施工通航换推、绞滩水工模型试验研究报告[R]重庆:重庆西南水运工程科学研究所,1997. 被引量:1
  • 5杨文俊;周良景;朱光淬.三峡工程明渠导流及其通航研究与运行效果[A]北京:中国水利学会,2002280-283. 被引量:1
  • 6杜宗伟;张绪进;母德伟.三峡工程二期施工期通航设施航线规划及航道整治水工模型试验研究报告[R]重庆:重庆西南水运工程科学研究所,1996. 被引量:1
  • 7杜宗伟;李霞;张绪进.小南海枢纽施工导流与通航条件关键技术研究[R]重庆:重庆西南水运工程科学研究所,2012. 被引量:1
  • 8刘厚安,胡本礼,陈豫.三峡导流明渠通航安全研究[J].中国船检,2002(12):63-63. 被引量:2

共引文献1

同被引文献22

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部