摘要 针对性能随时间衰减的锅炉蒸汽系统循环调度问题进行了相应的数学建模。结合模型具有整型变量、非线性程度高的特点,提出最速下降近似线性规划算法(SDALP)。该算法在传统近似线性规划的基础上引入了最速下降法目的性搜索的思想,重新定义了缩小调整变量边界的判断条件和边界调整途径。最后采用该算法对某电厂锅炉蒸汽循环调度实例进行了仿真优化,结果表明:新优化算法计算得到的调度方案比原调度方案更优,且节能效果明显。 A mathematical model for cyclic scheduling problem of the boiler system with decaying performance was built.Considering the characteristics of existing integer variables and high nonlinearity degree in this model,a new steepest descent-approximate linear programming(SDALP)algorithm was proposed,which having the purposeful search idea and rapid convergence of the steepest descent method introduced based on traditional approximate linear programming method,and having judgment conditions and the way of boundary adjustment redefined.Simulation in practice shows that the new algorithm outperforms the old scheduling scheme along with obvious energy-saving effect.
出处 《化工自动化及仪表》 CAS 2012年第10期1292-1295,1327,共5页 Control and Instruments in Chemical Industry
关键词 循环调度 最速下降近似线性规划 非线性规划 cyclic scheduling,steepest descent-approximate linear programming,nonlinear programming
  • 相关文献

参考文献8

二级参考文献19

  • 1Casas-Liza J, Pinto JM and Papageorgiou LG. Mixed integer optimization for cyclic scheduling of multiproduct plants under exponential performance decay. Chemical Engineering Research and Design, 2005, 83 : 1208 - 1217. 被引量:1
  • 2Georgiadis MC and Papageorgiou LG. Optimal energy and cleaning management in heat exchanger networks under fouling. Chemical Engineering Research and Design, 2000, 78 : 168 - 179. 被引量:1
  • 3Georgiadis MC, Papageorgiou LG and Macchietto S. Optimal cleaning policies in heat exchanger networks under rapid fouling. Industrial and Engineering Chemistry and Research, 2000, 39:441 - 454. 被引量:1
  • 4Yan LX and Ma DX. Global optimization of non-convex nonlinear programs using line-up competition algorithm. Computers and Chemical Engineering, 2001, 25 : 1601 - 1610. 被引量:1
  • 5Yan LX, Shen K and Hu SH. Solving mixed integer nonlinear programming problems with line-up competition algorithm. Computers & Chemical Engineering, 2004, 28 ( 12 ) :2647 - 2657. 被引量:1
  • 6Casado E. Model optimizes exchanger cleaning. Hydrocarbon Process, 1990, 69:71 -/76. 2 被引量:1
  • 7Sheikh AK, Zubari SM, Haq MU and Budair MO. Reliability-based maintenance strategies for heat-exchangers subject to fouling. Transactions of the ASME, 1996, 118:306-312. 被引量:1
  • 8Markowski Mariusz and Urbaniec Krzysztof. Optimal cleaning schedule for heat exchangers in a heat exchanger network. Applied Thermal Engineering, 2005, 25(7) :1019 - 1032. 被引量:1
  • 9Jain V and Grossmann IE. Cyclic scheduling of continuous parallel process units with decaying performance. American Institute of Chemical Engineering Journal, 1998, 44 : 1623 - 1636. 被引量:1
  • 10Alle Alessandro and Pinto Jose M. Papageorgiou Lazaros G. The economic lot scheduling problem under performance decay. Industrial and Engineering Chemistry Research, 2004, 43 ( 20 ) : 6463 - 6475. 被引量:1

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部