基于PERT的工程网络计划模糊完工概率分析 被引量:7

Analysis on fuzzy completion probability of network plan of project construction based on PERT
下载PDF
导出
摘要 由于工程建设项目工期较长,而影响工期风险的因素众多,对其进行风险分析及控制显得尤为重要。在PERT(计划评审技术)和模糊概率理论下,提出基于PERT的模糊完工概率分析模型,在此模型中赋予计划工期一个隶属度函数,根据项目的具体情况,完成对项目工期风险的模糊等级评价,可有效提高网络计划完工概率的估计精度,并且与传统的PERT法相比,结果更加符合实际情况。通过实例分析,该方法可为工程决策者在进行工期风险决策时提供依据。 The risk analysis and control of project construction are significant because of long construction period and numerous risk factors.Based on Program Evaluation and Review Technique(PERT) and fuzzy probabilistic theory,an analytical model of fuzzy completion probability is proposed.The planned period is endowed with a member function,which can be used to complete the evaluation for fuzzy degree of risk during the construction period in view of the specific conditions of project.In this way,it can raise estimated accuracy of network plan completion probability.Meanwhile,the result is more in line with the actual situation compared with PERT method.The case analysis shows that the method can provide the basis for making the risk decisions of construction period for engineering decision makers.
作者 陈瑞 黄建文
出处 《人民长江》 北大核心 2012年第20期92-94,101,共4页 Yangtze River
基金 教育部科学技术研究重点项目(208092) 宜昌市科学技术研究与开发项目(A2011-302-1)
关键词 模糊完工概率 概率分析 PERT 隶属度 fuzzy completion probability probability analysis PERT membership
  • 相关文献

参考文献6

二级参考文献9

共引文献8

同被引文献53

引证文献7

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部