超超临界600MW机组高压旁路阀螺栓失效分析 被引量:5

ANALYSIS OF BOLT FAILURE FOR HIGH PRESSURE BYPASS VALVE OF ULTRA-SUPERCRITICAL 600 MW UNIT
下载PDF
导出
摘要 某电厂超超临界600MW机组的高压旁路阀部分螺栓发生不同程度地损坏,通过宏观检验、合金成分分析、力学性能检验、金相检验及能谱分析等方法,对螺栓失效原因进行分析。结果表明:螺栓失效原因为应力腐蚀开裂,与螺栓原材料固溶处理状态较差、硬度过高及螺纹加工硬化有关。对此,提出了加强备品螺栓检验,控制安装时的预紧力,避免污染腐蚀等预防措施。 Through macroscopic inspection,alloy composition analysis,mechanical property detection,metallographic examination,fracture analysis,and energy spectrum analysis etc.,the causes leading to bolt failure of high-pressure bypass valve for an ultra-supercritical 600 MW unit have been analysed.Results show that the failure was due to stress corrosion cracking,which was mainly resulted from bad solid-solution treatment of bolt raw material,too high hardness,and work hardening of threads.For this,some preventive measures,such as strengthening inspection of spare bolts,controlling the pretightening load during installation,and avoiding pollution and corrosion etc.,have been put forward.
出处 《热力发电》 CAS 北大核心 2012年第8期86-90,共5页 Thermal Power Generation
关键词 600 MW机组 高压旁路阀 螺栓 应力腐蚀 固溶处理 加工硬化 600 MW unit high-pressure bypass valve bolt stress corrosion solid-solution treatment work hardening
  • 相关文献

参考文献3

  • 1崔约贤,王长利编著..金属断口分析[M].哈尔滨:哈尔滨工业大学出版社,1998:236.
  • 2GB/T 229-2007.金属材料 夏比摆锤冲击试验方法[S]..2007 被引量:1
  • 3.Standard Specification for NickelChromium Molybdenum Columbium Alloy (UNSN06625),Nickel Chromium Molybdenum Sili-con Alloy (UNSN06219),and Nickel Chromium Mo-lybdenum Tungsten Alloy (UNS N06650)Rod and Bar[].ASTM B—. 被引量:1

同被引文献45

  • 1钟世梁,黄荣国,许冰.600MW机组高压旁路减温减压阀热应力计算及寿命估算[J].动力工程,2005,25(2):267-270. 被引量:11
  • 2Dalitz F,Maiwald M,Guthausen G.Considerations on the design of flow cells in by-pass systems for process analytical applications and its influence on the flow profile using NMR and CFD[J].Chemical Engineering Science,2012,75(25):318-326. 被引量:1
  • 3Tsai C W,Shih C,Wang J R,et al.On study of steam bypass and pressure control system for Lungmen nuclear power plant[J].Procedia Engineering,2011,15:5328-5332. 被引量:1
  • 4Wiirdemann H,Westphal A,Lerm S,et al.Influence of microbial processes on the operational reliability in a geothermal heat store-results of long-term monitoring at a full scale plant and first studies in a bypass system[J].Energy Procedia,2014,59:412-417. 被引量:1
  • 5WANG Weibing,WANG Xudong,LIU Dongju.IP start-up control for 300 MW turbine unit with bypass system[J].Procedia Engineering,2011,16:493-498. 被引量:1
  • 6Pugi L,Galardi E,Carcasci C,et al.Preliminary design and validation of a real time model for hardware in the loop testing of bypass valve actuation system[J].Energy Conversion & Management,2015,92:366-384. 被引量:1
  • 7Sang H Y,Lee J G,Suh K Y.Direct vessel inclined injection system for reduction of emergency core coolant direct bypass in advanced reactors[J].Nuclear Engineering and Design,2006,236(22):2329-2342. 被引量:1
  • 8Krivopuskov D A.Computer technology for valve and accessory designers and manufacturers[J].Chemical & Petroleum Engineering,2005,41(3):211-214. 被引量:1
  • 9ZHU Xiaoxiao,ZHANG Shimin,TAN Guibin,et al.Experimental study on dynamics of rotatable bypass-valve in speed control pig in gas pipeline[J].Measurement,2014,47(1):686-692. 被引量:1
  • 10Rensburg N J V,Steyn J L,Els P S.Time delay in a semi-active damper:modelling the bypass valve[J].Journal of Terramechanics,2002,39(1):35-45. 被引量:1

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部