摘要
本文针对喀斯特地貌下人工挖孔桩施工常见问题提出了相应的处理方法,供参考。
Based on the common condition occurs during in Manual hole digging pile construction in landforms of Kras,authors introduced some condition that should pay attention to and gaved some suggestion to solve them.Authors hope to give you a hand.
出处
《四川建材》
2012年第2期176-177,共2页
Sichuan Building Materials
关键词
喀斯特地貌
人工挖孔桩
溶洞
流塑性状态
Landforms of Kras
Manual hole digging pile
Solution cavity
Plastic state