摘要
通过对2011年苏里格气田桃2井区地面工程建设施工中管线测量放线和估算管线长度的探讨,利用mapsource软件进行管线预估计和管线线路的提前定线,做到材料最节省、施工最简单,管线沿程损失最少,尽快落实管线线路,为下道工序的施工做充分准备,也为今后的单井管线施工提供借鉴。
Through exploring the pipeline surveying setting-out and estimating the pipeline length during the ground construction in Tao 2 well area of Sulige gas field in 2011,in order to save materials,simplify the construction,implement the pipeline line as quickly as possible,the estimation of the pipeline and alignment of the pipeline routes were carried out by Mapsource software,which can provide a reference for single well pipeline construction in the future.
出处
《辽宁化工》
CAS
2012年第7期726-728,共3页
Liaoning Chemical Industry