应用现代PLC控制技术,对300 t转炉用大型工器具修炉塔设备进行升级改造。改造后,转炉修炉塔能够实现零故障运行,满足大中修工作中砌炉工序的需求。
The modern PLC control technology was applied to upgrading reconstruction of large relining tower of 300 tons converter.After the reconstruction,the relining tower of converter could run smoothly and meet the demand of bricking process in the overhaul and maintenance work.
出处
《冶金动力》
2012年第1期73-74,共2页
Metallurgical Power
关键词
修炉塔
PLC技术
零故障
砌炉工序
relining tower
PLC technology
zero fault
bricking process