摘要 东莞篮球中心主体育馆钢结构屋面吊顶工程,屋顶最高点36.5m,屋面为马鞍型结构,钢结构外环和内环的长度相差较大,呈梯形,且立面有多个马道及吊杆影响施工,因此给吊顶设计、加工及安装均带来一定的难度。为了不影响施工速度,吊装方案设计要遵循安全、实用、经济、合理的原则,采用一种合理的缆索式移动操作平台,即可解决高空车无法满足大范围辐射的吊顶板安装,又可节省大量满堂架周转材料费用,既经济又能保证工期、施工质量和安全。 Basketball Center,Dongguan Stadium steel roof ceiling construction,the highest point of the roof 36.5m,between the main structure is trapezoidal,the facade there are multiple affected horses road and the construction boom.So to the ceiling design,manufacture and installation of all bring some difficulty.In order not to affect the speed of construction,lifting program designed to follow the safe,practical,economic,reasonable,rational cable using a mobile platform,can be solved aerial vehicles can not meet a wide range of radiant ceiling panel installation,but also save a lot of material packed shelf turnover costs,both economic,but also ensures that schedule,construction quality and safety.
出处 《广东土木与建筑》 2011年第7期33-37,共5页 Guangdong Architecture Civil Engineering
关键词 马鞍型屋面吊顶 缆索式移动平台 平台的设计与运行 可拆卸单元平台 roofing ceiling cable mobile platform platform design and operation
  • 相关文献

参考文献2

二级参考文献1

  • 1JG 5027-1992.高处作业吊篮安全规则[S],1992. 被引量:1

共引文献1

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部