摘要 结合某污水处理厂改良A2/O生化池设计实例,介绍大型钢筋混凝土加盖池体如何合理进行池体盖板结构布置,以及合理设置贯穿池体盖板、底板及壁板的变形缝。为避免贯通缝打断池体盖板梁板结构,解决池体盖板支承困难,本工程采取沿池体壁板设置通长条状牛腿等方法予以解决,另外也给出了试水工况下分块池体在深水压力作用下的抗滑移设计方法。 This paper based on a finished structure-Improved A2/O biochemical tank of wastewater treatment plant project,introduces the large reinforced concrete pool how to be properly covered with beam-slab structure,and how to be properly divided into several blocks by the deformation joint throughout the cover slab,bottom slab and wall panel of the pool.In order to avoid the beam-slab structure to be interrupted by the through seam,brackets along wall panel were introduced into the structure.In addition,it also gives a design method to solve the sliding resistance of the divided blocks of the pool which was under the pressure of deep water.
作者 田向阳
出处 《广东土木与建筑》 2011年第5期19-21,共3页 Guangdong Architecture Civil Engineering
关键词 盖板支承结构 壁板通长牛腿 抗滑移设计 supporting structure of cover slab bracket along wall panel sliding resistance design
  • 相关文献

参考文献2

二级参考文献7

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部