期刊文献+

Multilevel hierarchical production planning architecture for engineer-to-order enterprises 被引量:2

Multilevel hierarchical production planning architecture for engineer-to-order enterprises
下载PDF
导出
摘要 The critical materials and critical parts are keys to the production at Engineer to Order (ETO) enterprises implies that the control of plans for critical materials and critical parts is essential to the control of all plans at ETO enterprises. A mixed mode of hierarchical network planning/MRP (NP/MRP) is proposed to generate network plans for critical materials or critical parts from project networks and the plans for non critical parts produced by MRP are constrained by the related project networks. The multilevel hierarchical network planning/MRP mixed planning (MHNM) architecture proposed is the extension of the hierarchical NP/MRP to the supply chain based on the temporal constraints of multilevel project networks for critical materials or critical parts. A general model is formulated for scheduling tasks on machines at work centers as well. The critical materials and critical parts are keys to the production at Engineer to Order (ETO) enterprises implies that the control of plans for critical materials and critical parts is essential to the control of all plans at ETO enterprises. A mixed mode of hierarchical network planning/MRP (NP/MRP) is proposed to generate network plans for critical materials or critical parts from project networks and the plans for non critical parts produced by MRP are constrained by the related project networks. The multilevel hierarchical network planning/MRP mixed planning (MHNM) architecture proposed is the extension of the hierarchical NP/MRP to the supply chain based on the temporal constraints of multilevel project networks for critical materials or critical parts. A general model is formulated for scheduling tasks on machines at work centers as well.
出处 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2002年第3期254-258,共5页 哈尔滨工业大学学报(英文版)
基金 theNationalHi TechDevelopmentProgramofChina(GrantNo.2 0 0 1AA41115 0and 863 -5 11-944 -0 0 1)
关键词 engineer-to-order supply CHAIN network PLANNING SCHEDULING engineer to order supply chain network planning scheduling
  • 相关文献

参考文献1

二级参考文献1

共引文献4

同被引文献16

  • 1席裕庚,柴天佑,恽为民.遗传算法综述[J].控制理论与应用,1996,13(6):697-708. 被引量:352
  • 2王永坡,邓家褆.动态联盟产品数据集成框架研究[J].计算机集成制造系统,2007,13(5):905-910. 被引量:5
  • 3龙红能,王为民,戈鹏,夏开渝,王政.产品开发协同工作环境模型及其应用[J].计算机工程与应用,2007,43(20):235-239. 被引量:2
  • 4Ulrich K T,Eppinger S D.Product design and development:second edition[M].[S.l.]:McGraw-Hill,2000. 被引量:1
  • 5CHEN Chin-sheng. Concurrent engineer-to-order operation in the manufacturing engineering contractingindustries [J]. International Journal of Industrial and Systems Engineering, 2006, 1 (1/2) : 37-58. 被引量:1
  • 6EARL C, SONG Dong-ping, HICKS C. Planning complex engineer-to-order products [M] // GOGU G, COUTELLIER D, CHEDMAIL P, eds. Recent Advances in Integrated Design and Manufacturing in Mechanical Engineering. Dordrecht: Kluwer, 2003 : 463-472. 被引量:1
  • 7GONCALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource constrained multi-project scheduling problem [J]. European Journal of Operational Research, 2008, 189(3) :1171-1190. 被引量:1
  • 8VAN PETEGHEM V, VANHOUCKE M. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem [J]. European Journal of Operational Research, 2010, 201(2) :409-418. 被引量:1
  • 9PANN H, HSAIO P W, CHEN K Y. A study of project scheduling optimization using Tabu Search algorithm [J]. Engineering Applications of Artificial Intelligence, 2008, 21(7) :1101-1112. 被引量:1
  • 10CHIANG Chuan-wen, HUANG Yu-qing, WANG Wen-yen. Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling [J]. Journal of Intelligent & Fuzzy Systems, 2008, 19(4) :345-358. 被引量:1

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部