摘要
针对世界上最高的水布垭混凝土面板堆石坝填筑施工质量要求,在研究分析国内外面板堆石坝填筑施工质量控制基本方法的基础上,提出以GPS定位技术等自动化监控技术为手段的堆石坝大坝填筑施工质量管理监控系统。
Aiming at the construction quality demand of Shuibuya CFRD( Concrete-Faced Rockfill Dam), the highest dam in the world which will soon go into operation, the techniques of quality control of such dam both in foreign countries or at home are analyzed, in order to use the experience for reference. On the basis of GPS (global position system) and other automatic monitoring techniques, a monitored control system of construction quality of Shuibuya CFRD is proposed.
出处
《湖北水力发电》
2002年第1期27-28,42,共3页
Hubei Water Power
关键词
面板堆石坝
施工质量管理
监控系统
GPS定位技术
concrete-faced rockfill dam, construction quality management, monitoring system, GPS positioning technics