摘要
并联电容器组在变电站的运行中有相当一部分故障是因为施工质量差而引起。本文主要讨论在并联电容器工程施工中由于隐蔽工程、电容量不平衡、熔断器安装角度不正确、接头发热及放电线圈接线不正确等对电容器组运行的影响。为此,要高度重视并联电容器工程施工质量的监理。
Most of the breakdowns in shunt capacitor banks during the substation operation is due to the construction quality.This paper mainly discusses the factors that influence on the shunt capacitor bank operation,such as concealed work,unbalanced capacitance,incorrect installation angle of the fuse,connector overheating and incorrect connection of discharge coil.It must,therefore,pay more attentions to the construction quality of shunt capacitor project.
出处
《电力电容器与无功补偿》
2005年第4期38-40,共3页
Power Capacitor & Reactive Power Compensation
关键词
电容器组
施工质量
监理
Capacitor bank
Construction quality
Inspection