摘要
The beam matching status between the two isochronous cyclotrons in the Heavy Ion Research Facility a the Lanzhou-Cooling Storage Ring(HIRFL-CSR)is described.Several methods which can be used to accomplish 100% matching are proposed.By comparing of them,the best method is determined.The advantage due to this method i discussed.
描述了兰州重离子加速器中两台等时性回旋加速器的匹配现状,提出了几种可达到100%匹配效率的方法并进行了比较,得到了最佳方案.并叙述了该方案其他的优越性.
基金
兰州重离子加速器国家实验室资助~~