期刊文献+

引黄南干二级泵站高压喷射灌浆试验

In-situ Experiment of High pressure Gunite For the Secondary Pumping Station of the South Main Line of the YRDP
下载PDF
导出
摘要 :本文介绍了引黄南干二级泵站高喷灌浆施工试验的参数选定 The in situ experiment of high pressure gunite,which is to be used for building a seepage prevention wall in the secondary pumping station of the South Main Line of the YRDP is introduced,the parameters required for the construction of the high pressure gunite being obtained through the experiment.
出处 《山西水利科技》 2000年第S1期35-37,共3页 Shanxi Hydrotechnics
关键词 高压喷射灌浆 施工试验 参数选定 High pressure Gunite In situ Experiment Parameter determination
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部