摘要
麻柳中桥上部结构设计为5片30m的T梁,采用铺轨道拖拉架设的方法,顺利安全地完成了T梁的安装,节约了成本。
The design of the upper structure of Maliu Middle Bridge uses 30 m T girder,adopting the track drag ecrection method,with the safe and smooth installation of T girder and the saving of cost.
出处
《铁道建筑技术》
2009年第3期13-14,38,共3页
Railway Construction Technology
关键词
T梁
拖拉架设
施工
T girder
drag erection
construction