摘要 清江水布垭地下电站尾水隧洞位于Ⅳ~Ⅴ类岩体中,软岩开挖成洞难,施工中采用了上、下层分层开挖,随机锚杆,超前锚杆(注浆),钢支撑支护及时跟进的方式,确保了围岩的稳定和施工安全。 The tailrace tunnel of Shuibuya Hydropower Station is located in soft rockmass of classification Ⅳ-Ⅴ and is excavated according to the procedure of upper section and lower section in sequence.The surrounding rock is strengthened with stochastic anchor bars and advanced-grouted bars,and is supported with steel frames timely in construction course.The excavation is completed safely.
作者 黄骞 普国江
出处 《湖北水力发电》 2008年第6期21-23,共3页 Hubei Water Power
关键词 尾水隧洞 开挖施工 控制爆破 支护 tailrace tunnel excavation controlled blasting support