摘要
介绍某浮法玻璃厂80m钢筋混凝土烟囱加固设计和施工。并对烟囱筒壁混凝土起鼓碎裂的原因进行分析计算。
This text will introduce a reinforce design and constructions of a 80 meters high concrete chimney in a float method glass factory.And analyze to compute the reason why the wall of the chimney plumped up & chipped.
出处
《工业建筑》
CSCD
北大核心
2008年第z1期998-1001,共4页
Industrial Construction
关键词
烟囱
起鼓碎裂
热阻
隔热层
加固设计
chimney plump up & chip hot resistance the layer of heat insulation the design of reinforce