摘要
为解决建筑物的沉降差异、钢筋混凝土的收缩变形、温度应变等结构和功能上的矛盾 ,后浇带法已得到广泛应用 .但该方法在实际施工过程中还存在着一些不足之处 .本文结合“世纪城”工程实际 ,提出了后浇带法在设计施工中应注意的事项 .
Post-Cast zones are widely used in enginnering to solve the contradictions of building's structure and functions in settlements divergence, reinforced concreat contract, temperature strain etc. Based on Century Castle Project, some constructive suggestions are made.