摘要
介绍了长洲水利枢纽坝址洪水设计时,对西江中下游历史洪水调查和重现期考证,并对成果合理性、一致性进行分析及频率计算,同时归槽洪水的考虑使长洲水利枢纽设计洪水成果更合理。
In the course of dam site flood design for Changzhou hydraulic complex,the historical flood of the middle and lower west river was investigated and textual research of the recurrence interval was conducted,the rationality and consistency of investigation and research results were analyzed with frequency calculation.Taking into consideration of regression flood makes the design flood results of Changzhou hydraulic complex more rational.
出处
《广西水利水电》
2006年第4期37-40,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
设计洪水
长洲水利枢纽
归槽洪水
西江
Design flood
Changzhou hydraulic complex
regression flood
west river