摘要
深基坑支护是一门理论性和实践性都很强的技术,在不同的地质条件、不同的建筑结构中应具体对待。在潮州供水枢纽工程西溪厂房基坑内支撑设计中,承包方经过技术、经济、工期的反复比较,优化支撑设计,采用混凝土结构代替原设计钢结构支撑方案,取得较佳效果,值得推广。
According to different geological conditions and building structures,an optimal design is used in the braces for supporting the excavation of Xixi Workshop of Chaozhou Water Junction Project.Concrete structures are used to replace the steel braces in the original design by comparing the technology,economy and construction time of the project.Excellent results are obtained,which is worth popularizing.
出处
《工业建筑》
CSCD
北大核心
2007年第z1期823-825,共3页
Industrial Construction
关键词
工程
深基坑
支护
优化
project deep excavation supporting optimization