摘要
针对大型项目混凝土供应特点,本文运用排队论模拟三种商品混凝土供应模式的运作过程并计算其效率指标。通过比较三种模型的效率指标可以确定更优越的供应方案,并总结出一种常见的非典型排队模型的算法。
Base on the characteristics of concrete supplying in great project,this paper simulated the operations of the three concrete supplying modes and calculated their efficiency targets by the Queuing theory.By comparing them,we found out the best one and the untypical queuing theory algorithm.