摘要
以秦岭1号隧道工程为例,对二次衬砌施工时间的确定和施工准备工作进行了介绍,并对钢筋绑扎,混凝土的搅拌、运输及其浇筑,拆模与养护等各施工环节的二次衬砌混凝土的施工技术进行了阐述,对类似工程具有参考价值。
Taking works of No.1 Qinling tunnel as example determination of construction time and preparation work of secondary lining are introduced.According to assembling reinforcement,concrete mixing,transport and pouring,striping,curing and other aspects practical construction technology is introduced for secondary lining works,which provides good references for similar works.
出处
《山西建筑》
2007年第8期297-298,共2页
Shanxi Architecture
关键词
公路隧道
二次衬砌
施工技术
钢筋绑扎
highway tunnel
secondary lining
construction technology
assembling reinforcement