摘要
结合湖北随岳南高速公路30 m T梁,详细论述了先简支后连续桥梁的湿接缝要求及施工过程,系统地总结了30 m T梁先简支后连续桥梁湿接缝的施工技术特点、施工工艺和施工技术指标控制,以期为同类工程施工提供参考。
Combined with practical work in Suiyuenan expressway in Hubei province specifications on the construction of wet joint of 30 m continuous bridge erected as simple-supported T-beam and construction process are introduced in detail.Meanwhile,technical features,construction technology and index control in construction are summarized in order to provide references for similar works.
出处
《山西建筑》
2007年第7期312-313,共2页
Shanxi Architecture
关键词
先简支后连续桥梁
湿接缝
施工
结构特点
continuous bridge erected as simple-supported T-beam
wet joint
construction
structural feature