摘要
研究了配置相量测量单元(PMU)后电力系统可观测性的判断方法,以保证电力系统完全可观测为约束条件,以配置PMU数目最小和保证测量量具有最大量测冗余度为目标,建立了PMU最优配置问题的数学模型。这是一个多目标优化问题,需要寻求一组Pareto最优解,应用多目标进化算法求解该问题可以得到多种满足条件的PMU配置可行方案。最后,以IEEE39节点系统为例验证了该方法的合理性。
The analysis method to judge the observability of power system equipped with phasor measurement units (PMUs) is studied. Taking the observability of whole system as constraint condition and both minimal number of PMUs to be equipped and maximal measurement redundancy of measured quantities as the objectives, the mathematical model of optimal placement of PMU is formed. This is a multi-objective optimization problem, so a set of Pareto optimal solutions have to be sought. Solving this problem by multi-object...
出处
《电网技术》
EI
CSCD
北大核心
2005年第22期45-49,75,共6页
Power System Technology