期刊文献+

基于BIM软件CATIA三河口水利枢纽料场规划研究

The Field Planning Research of Sanhekou Project Based on BIM Software CATIA
下载PDF
导出
摘要 针对料场规划传统二维CAD设计效率低下及规划方案施工期易变等问题,本文结合引汉济渭三河口水利枢纽柳木沟料场,介绍了基于BIM软件CATIA参数化动态设计方法.首先建立料场区域三维地形面;其次依据地形地质资料完成料场方案设计及优化调整;最后针对施工期所遇问题和需求,利用规划CATIA模型完成方案修改及相关数据获取,实现了料场设计从项目前期到施工期的生命周期解决方案.运用情况表明,CATIA三维设计参数化等设计方法不仅提高了设计人员工作效率,且其可视化的模型使参建各方易于熟悉设计意图,有利于提高项目沟通效率及质量. For the problem of the field planning with traditional two-dimensional CAD design efficiency being low and construction period being variable,,the paper introduces the parameterized dynamic design method of BIM software CATIA based on sanhekou water conservancy liumugou field.Firstly,using CATIA creates a three-dimensional terrain surface.Secondly,according to the topography and geological data completes the field plan design and optimization.Finally,for the problems and requirements of construction period,using CATIA model completes program modification and gets relevant data,realizing the life cycle solutions of the field design from the early stage of the project to the construction period.The application shows that the CATIA using parameterized design method improves design efficiency and using visualized model allows cooperated-builing parties easier to familiar with the design intent,which improves the project communication efficiency and quality.
作者 付登辉 FU Deng-hui(Shaanxi province institute of water resource and electric power investigation and design,xi'an,710001)
出处 《区域治理》 2018年第17期191-192,共2页 REGIONAL GOVENANCE
关键词 引汉济渭三河口水利枢纽 柳木沟料场规划 CATIA三维设计 Yinhanjiwei sanhekou water conservancy Liumugou field plan CATIA 3d design
  • 相关文献

参考文献3

二级参考文献7

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部