4[7]Cali A, Conti S, Oriti C, et al. Utilisation of Static Circuit Breakers in Loop Distribution Systems for Reliability Improvement. In: 8th International Conference on Harmonics and Quality of Power Proceedings. 1998. 982~987 被引量:1
5Chowdhury A,Mielnik T,Lawton L E,et al.Reliability worth assessment in electric power delivery systems[C].2004 IEEE Power Engineering Society General Meeting,USA,2004,1:654-660. 被引量:1
6Espie P,Ault G W,McDonald J R.Multiple criteria decision making in distribution utility investment planning[C].Proc.Int.Conf.On Electric utility deregulation and restructuring and power technologies2000 (DRPT),London,UK,April 2000:576-581. 被引量:1
7Espie P,Ault G W,Burt G M,et al.Multiple criteria decision making techniques appliedto power distribution planning[J].Generation,Transmission and Distribution,2003,150(5):527-535. 被引量:1
8Roy B.The problems and methods with multiple objective functions multiple[J].Mathematical Programming,1971,1(2):239. 被引量:1
9Roy B.Multicriteria methodology for decision aiding[M].Dordrecht:Kluwer Academic Publishers,1996. 被引量:1
10Beccali M,Cellura M,Mistretta M.Decision-making in energy planning:Application of the ELECTRE method at regional level for the diffusion of renewable energy technology[J].Renewable Energy,2003,28(13):2063-2087. 被引量:1