摘要
按照公交都市的创建要求,南京市逐步开展轨道交通与地面交通一体化换乘设施规划与建设工作,力求打造高效、安全、舒适的一体化换乘体系,使轨道交通与地面交通协调发展,但缺少对方案实施后的评估研究。以南京地铁3号线江北段为例,通过对一体化设施实施后需求和使用情况的调研分析,并结合方案规划情况,采用层次分析法,对方案规划及实施情况进行评估,并提出改善建议。
With the rapid development of the Nanjing rail transit network according to requirements for the establishment of metropolis transit,Nanjing has gradually promoted the planning and establishment of rail transit and ground transportation integration facilities,striving to create efficient,safe,and comfortable traffic integration for a seamless transfer system.Taking the Jiangbei section of Nanjing Metro Line 3 as an example,the implementation assessment of the integration facilities was studied through the investigation of the current status,combined with the program planning.Then,the analytic hierarchy process was used to research the program planning and implementation,finally resulting in suggestions for improvement.
作者
甘骞
孟丹青
GAN Qian;MENG Danqing(Nanjing Metro Group Co.,Ltd.,Nanjing 210000;Nanjing Metro MTR Limited Liability Company,Nanjing 210000)
出处
《都市快轨交通》
北大核心
2020年第1期54-59,共6页
Urban Rapid Rail Transit
关键词
轨道交通
一体化换乘
实施评估
层次分析法
改善建议
rail transit
integration facilities
implementation assessment
analytic hierarchy process
suggestions for improvement