期刊文献+

高装配率钢结构建筑关键技术 被引量:3

Key technology of steel structure building with high assembly rate
下载PDF
导出
摘要 高装配率装配式钢结构建筑的结构体系可采用钢框架-钢板组合剪力墙,结构构件采用装配式部件。建筑设计采用模块化和标准化设计方法,通过建立基本功能模块,以特定方式进行组合,结合实际功能和使用要求,构建出整体功能区块,通过“少规格、多组合”来实现建筑功能和立面多样化效果。结构设计采用内置螺杆钢板组合剪力墙,工厂预制、现场免模板和支撑拼装;钢板组合剪力墙和钢框梁连接采用双夹板加强构造,有效传递梁端荷载,避免钢板组合剪力墙设置内隔板的复杂加工工序。 The structural system of prefabricated steel structure building with high assembly rate can adopt steel frame-steel plate composite shear wall,and the structural members adopt prefabricated parts.The architectural design adopts the modular and standardized design method,through the establishment of basic functional modules,combined in a specific way,combined with the actual function and use requirements,to build the overall functional block;through"fewer specifications and more combination"to achieve the architectural function and facade diversification effect.The built-in screw steel plate combination shear wall is used in structure design by factory prefabricated,on-site free formwork and support assembly;the steel plate composite shear wall and steel frame beam are connected by double splint reinforcement structure,which can effectively transfer the load at the end of the beam and avoid the complex processing procedure of setting up the inner partition of the steel plate composite shear wall.
作者 沈琪雯 余周 陶修 薛尚铃 罗福盛 徐革 李建 杨洋 周礼婷 蔡正凯 SHEN Qiwen;YU Zhou;TAO Xiu;XUE Shangling;LUO Fusheng;XU Ge;LI Jian;YANG Yang;ZHOU Liting;CAI Zhengkai(CISDI Engineering Co.,Ltd.,Chongqing 400013,P.R.China;School of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China)
出处 《重庆大学学报》 CAS CSCD 北大核心 2022年第S01期55-59,共5页 Journal of Chongqing University
基金 重庆市建设科技计划项目(城科字2021第1-1)
关键词 钢板组合剪力墙 装配式建筑 标准化设计 模块化设计 steel plate composite shear wall assembled building standardized design modular design
  • 相关文献

参考文献5

二级参考文献52

  • 1宗周红,林于东,陈慧文,葛继平,杨强跃.方钢管混凝土柱与钢梁连接节点的拟静力试验研究[J].建筑结构学报,2005,26(1):77-84. 被引量:67
  • 2陆烨,李国强.日本一种建设产业化的高层巨型钢结构住宅体系[J].建筑结构,2005,35(6):28-31. 被引量:10
  • 3郭彦林 缪友武.两侧开缝钢板剪力墙弹性屈曲性能研究[J].建筑结构,2004,. 被引量:2
  • 4Astaneh- Asl A.Seismic Behavior and Design of Steel Plate Shear Walls. In : Structural Steel Educational Council Technical Informationand Product Service,2001. 被引量:1
  • 5Troy R,Richard R.Steel Plate Shear Walls Resist Lateral Load,CutCosts. Civil Engineering - ASCE, 1979(2) :53 --55. 被引量:1
  • 6Fujitani H, Yamanouchi H,Okawa l, et al. Damage and Performance of Tall Buildings in 1995 Hyogoken Nanbu Earthquake. In:The 67thRegional Conference, Council on Tall Building and Urban Habitat,Chicago: 1996,103 -- 125. 被引量:1
  • 7Naeim F. Lessons Learned from Performance of Nonstructural Components During the January 17, 1994 Northridge Earthquake-Case Studies of Six Instrumented Multistory Buildings.JSEE, 1999,2(1). 被引量:1
  • 8Hitaka T, Matsui C.Experimental Study on Steel Shear Wall with Slits. Journal of St ructural Engineering, 2003,129 (5). 被引量:1
  • 9Zhao Q, Astaneh- Asl A. Cyclis Behavior of Traditional and Innovative Composite Shear Walls. Journal of Structural Engineering, 2004,130(2). 被引量:1
  • 10Thorburn L J, Kulak G L, Montgomery C J.Analysis of Steel Plate Shear Walls.Struct. Engrg Rep. No.107. Edmonton: University of Alberta, 1983. 被引量:1

共引文献433

同被引文献27

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部