期刊文献+

南国中心二期结构设计

Structural design of Langold Center Phase Ⅱ
下载PDF
导出
摘要 南国中心二期为复杂商业综合体,购物中心采用混凝土框架-剪力墙结构,跨地铁车库采用预应力钢骨下弦空腹桁架。购物中心结构属于超长结构,同时存在平面大开洞,竖向构件不连续,大悬挑,大跨度特点。本文介绍了在地连墙-逆做法下的基础设计,购物中心大跨度的设计处理,超长结构的温度应力作用,以及对楼盖的舒适度的设计分析,带有预应力钢骨梁的空腹桁架在跨地铁车库中的分析与应用。 Langold center PhaseⅡis a commercial complex.The shopping center adopts a concrete frame-shear wall structure,and Open web truss with PSRC bottom chord is used in Crossing-subway garage.The shopping mall structure is a super-long structure,and there are large planar holes,vertical discontinuous columns,large overhangs,and large spans.This article introduces the foundation design of the reversed construction method,the design and treatment of the large span of the shopping mall,the temperature stress effect of the super-long structure,and the design analysis of the comfort of the floor,analysis and applications of open web truss with PSRC beam in Crossing-subway garage.
作者 杨鹏 阚明 白竺 徐超 薛鹏娜 张硕 YANG Peng;KAN Ming;BAI Zhu;XU Chao;XUE Pengna;ZHANG Shuo(Wuhan Hechuang Architectural Engineering Design Co.,Ltd.,Wuhan 430073,China)
出处 《建筑结构》 CSCD 北大核心 2021年第S01期43-51,共9页 Building Structure
关键词 地下连续墙 预应力钢骨梁 空腹桁架 跨地铁 underground diaphragm wall prestressed steel reinforced concrete open web truss crossing-subway
  • 相关文献

参考文献2

  • 1傅传国,李玉莹,娄宇著..预应力型钢混凝土结构试验研究及工程应用[M].北京:科学出版社,2007:247.
  • 2王连广编著..预应力钢与混凝土组合结构[M].北京:科学出版社,2009:371.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部