摘要
北京市昌平区百善镇百葛路3号院2号、4号地块居民小区为回迁安置小区,为尽快满足回迁安置需要,小区建设方决定建设小型一体化生活污水处理站对此居住小区内的生活污水进行处理。处理后经过专业实验室的检测证明该一体化设备对生活污水处理效果良好。处理后可达标排放入地表明渠。该设备适用于当污水口下游无法贯通时,可建设此类一体化污水处理站进行解决污水排放问题。使用在传统的A/O工艺(活性污泥法)中加入中空纤维式膜的MBR工艺将大幅节约建设用地,方便污水处理站建设,提高污水处理效率。
The residential areas of plots 2 and 4 of No.3 Baige Road,Baishan Town,Changping District,Beijing are relocation resettlement communities.In order to meet the needs of relocation resettlement as soon as possible,the community builder decided to build a small integrated domestic sewage treatment station The domestic sewage is treated.After the treatment,a professional laboratory test proves that the integrated equipment has a good effect on domestic sewage treatment.After treatment,the standard discharge can reach the ground indication channel.This equipment is suitable for the construction of such an integrated sewage treatment station to solve the problem of sewage discharge when the downstream of the sewage outlet cannot be penetrated.Using the MBR process with hollow fiber membrane added to the traditional A/O process(activated sludge process)will greatly save construction land,facilitate the construction of sewage treatment stations,and improve the efficiency of sewage treatment.
作者
屈新龙
邱鑫宇
Qu Xin-long;Qiu Xin-yu
出处
《建筑技术开发》
2020年第8期62-63,共2页
Building Technology Development
关键词
生活污水
地表排放
节约用地
domestic sewage
surface discharge
land conservation