期刊文献+

虎门二桥大沙水道桥东塔超高泵送混凝土配合比设计及应用

Design and Application of High Speed Pump Concrete Compatibility Ratio for the East Tower of Dashashuidao Bridge in Humen Second Bridge
下载PDF
导出
摘要 虎门二桥大沙水道桥东塔高193.1m,拟采用一泵到顶的混凝土泵送技术,针对该超高泵送混凝土施工技术,试验人员经过查阅相关资料、优选材料、采用双掺技术优化配合比设计,在施工过程中,严格控制混凝土工作性能,保证虎门二桥东塔混凝土顺利施工完成。 The east tower of Dasha waterway of Humen Second Bridge is 193.1 m high.IT IS planned to adopt a pump-totop concrete pumping technology.FOR the super-high pumping concrete construction technology,the test personnel optimize the mix ratio by consulting relevant materials,preferred materials and adopting double-mixing technology design,in the construction process,strictly control the concrete performance,to ensure the smooth construction of the East Tower concrete of Humen Second Bridge.
作者 蔡军露 李青 CAI Junlu;LI Qing(Quality Inspection Institute of China Communications 2nd Navigational Bureau 2nd Engineering Co.,Ltd,Chongqing 400042,China)
出处 《施工技术》 CAS 2019年第S01期1272-1274,共3页 Construction Technology
关键词 超高泵送 混凝土 配合比 设计 应用 super-high pumping concrete mix proportion design application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部