期刊文献+

TBM技术在2022年北京冬奥会延庆赛区综合管廊建设中的应用研究 被引量:1

Research of the technology of full face rock tunnel boring machine used in the process of the utility tunnel′s construction in Yanqing division of the Beijing 2022 Olympics Winter Games
下载PDF
导出
摘要 TBM技术在北京冬奥会延庆赛区综合管廊建设中的应用,是国内首例采用TBM技术施工的综合管廊案例,也是北京地区首例TBM应用案例。通过对工程建设条件、平面路由比选、纵坡设计分析、分舱布局创新、标准横断面功能及衬砌结构优化设计和适用性分析,结合工程服务对象重要性,从工期把控、投资规模、施工组织统筹协调性等各个方面分析比选,提出了理论比选结果,并结合工程实际建设,总结了全断面岩石掘进机技术在综合管廊建设中的积极作用、创新和不足。研究成果可以为城市地区盾构法、浅埋暗挖法建设综合管廊提供建设经验。 The technology of full face rock tunnel boring machine(TBM) used in the process of the utility tunnel’s construction in Yanqing division of the Beijing 2022 Olympics Winter Games, is the first use of TBM on the utility tunnel’s construction in China, and also the first use of TBM in Beijing. By study on engineering construction conditions, print the alternative route, longitudinal slope design analysis, subdivision layout innovation, standard cross-sectional function, lining structure optimization design, the engineering importance service object, time limit for a project to control, investment scale, construction organization, and so on. This paper puts forward the results of theoretical comparison and selection, and summarizes the positive role, innovation and deficiency of full face rock TBM technology in the utility tunnel. The conclusion could be referred to urban areas of shield method to shallow tunnel excavation method construction comprehensive pipe gallery provided direct construction.
作者 许光义 钱铁柱 刘烨华 朱荔 刘勇 王宗刚 XU Guangyi;QIAN Tiezhu;LIU Yehua;ZHU Li;LIU Yong;WANG Zonggang(Beijing Institute of Water,Beijing 100048,China)
出处 《水利水电技术(中英文)》 北大核心 2022年第S01期250-255,共6页 Water Resources and Hydropower Engineering
关键词 2022冬奥会 延庆赛区 综合管廊 管廊断面 结构设计 全断面岩石掘进机法 Beijing 2022 Olympics Winter Games Yanqing division utility tunnel utility tunnel section structure design full face rock tunnel boring machine
  • 相关文献

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部