期刊文献+

隧道施工地质灾害与致灾构造及其致灾模式 被引量:13

Geological Hazards and Disaster-Causing Structures in Tunnel Construction and Disaster-Causing Modes of Disaster-Causing Structures
下载PDF
导出
摘要 不同类型的隧道施工致灾构造,因隧道施工开挖接近和揭穿产生不同类型的隧道施工地质灾害,其致灾模式亦不尽相同。本文在总结隧道施工地质灾害类型的基础上,提出了不同类型隧道施工致灾构造的构成和隧道施工开挖揭穿与岩土盘破坏两种致灾构造致灾模式。 Different types of tunnel construction hazard-causing structures have different types of geological hazards due to the approach construction and construction exposure,and their hazard-causing modes are also different.Compositions of different types of disaster-causing structures,and the two hazard-causing modes(the disaster caused by construction exposure and the disaster caused by destruction of geotechnical plate)are proposed on the basis of summary of types of tunnel construction geological hazards in this paper.
作者 何发亮 HE Faliang(China Railway Southwest Research Institute Co.,Ltd.,Chengdu 611731)
出处 《现代隧道技术》 EI CSCD 北大核心 2019年第S01期138-143,共6页 Modern Tunnelling Technology
关键词 隧道施工 地质灾害 致灾构造 致灾模式 Tunnel construction Geological hazards Hazard-causing structures Hazard-causing modes
  • 相关文献

参考文献2

二级参考文献16

共引文献39

同被引文献171

引证文献13

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部