在铁路工程建设项目中,大多数选择以桥代路,桥梁工程占有很大的比重,箱梁梁场的设置是保证桥梁工程施工工期的前提,也是铁路工程施工组织设计中的重要一环。箱梁制存梁场的选址及规模大小直接影响桥梁工程的工期和铁路建设的经济性,文章以某铁路项目箱梁制存梁场设置方案为例,对箱梁制存梁场的设置方案进行比较分析,并提出推荐实施方案。
In railway engineering construction projects,most choose to use bridges instead of roads,and bridge engineering occupies a large proportion.The setting of box girder yard is the premise to ensure the construction period of bridge engineering,and it is also an important part of railway engineering construction organization design.The site selection and scale of box girder fabrication and storage yard directly affect the construction period of bridge engineering and the economy of railway construction.Taking the setting scheme of box girder fabrication and storage yard of a railway project as an example,this paper compares and analyzes the setting scheme of box girder fabrication and storage yard,and puts forward the recommended implementation scheme.
作者
徐李君
Xu Lijun(China Railway Shanghai Design Institute Group Co.,Ltd.,Shanghai 200070)
出处
《工程技术研究》
2022年第9期200-202,共3页
Engineering and Technological Research
关键词
铁路建设
箱梁制存梁场
选址方案
railway construction
box girder fabrication and storage yard
site selection plan