摘要
沙角C电厂2台进口主变压器自投运以来一直存在低压侧套管升高座发热的问题,为此,分析出现发热问题的原因并提出相应的改造措施。实施改造后,低压侧套管升高座没有出现低温过热的问题,保证了设备的安全运行。
The two imported generator transformers in Shajiao C Power Plant have undergone overheating on the LV bushing turrets since being put into operation.This paper analyzes the reason of the problem and presents a plan for alteration,which proves effective in solving the problem and safeguarding the equipments.
出处
《广东电力》
2003年第4期82-84,共3页
Guangdong Electric Power