以新能源为主体的微电网系统存在前期资本投入大、电网刚性不足等问题,特别是离网型微电网由于失去大电网的支撑,安全稳定运行面临更大的挑战。本文针对离网型交流微电网设计了双层调度策略,即经济最优化日前调度和日内稳定运行实时调度...以新能源为主体的微电网系统存在前期资本投入大、电网刚性不足等问题,特别是离网型微电网由于失去大电网的支撑,安全稳定运行面临更大的挑战。本文针对离网型交流微电网设计了双层调度策略,即经济最优化日前调度和日内稳定运行实时调度,在多时间尺度下灵活规划发电主体出力。首先,日前调度以微电网经济性运行为目标,利用全生命周期理论建立经济模型,计及储能电池荷电状态(state of charge,SOC)对寿命的影响;其次,日内实时调度以供电稳定性为目标,充分考虑预测误差给系统带来的可能性崩溃,利用储能PQ源实时修正VF源的功率偏差,改善储能VF源的健康状态;最后,通过算例仿真,得到满足微电网经济、稳定运行的综合优化调度方案,并验证了该策略的有效性和合理性。展开更多
The growing interest in energy conservation has inspired companies to seek alternatives to highly polluting fuel electricity generation. This study designed an optimised solar wind power generation system to fulfil th...The growing interest in energy conservation has inspired companies to seek alternatives to highly polluting fuel electricity generation. This study designed an optimised solar wind power generation system to fulfil the energy requirement of a cold chain logistics centre. This study first conducted a thorough analysis of the clarity indicators and daily temperature positions of the cold chain logistics centre, determined the average daily electricity demand, and proposed an effective design scheme. The energy simulation software, RETScreen 8.0, was used to determine the scale of solar photovoltaic and wind power projects that meet the expected energy needs of the cold chain logistics centre. The results indicated that the estimated annual total energy demand was 833689.2 kWh. The annual power generation of 6 kW from solar photovoltaic projects and 150 kW from wind power projects was found to be enough to meet the expected electricity demand. Solar photovoltaic power generation and wind power generation account for 2.44% and 97.56%, respectively. The hybrid energy system achieved a 96.6% reduction in carbon emissions and provides a reasonable payback period of 6.1 years and an electricity generation of 904368.674 kWh per year. The feasibility of the project and the calculated period of investment return are very reasonable. Therefore, this hybrid renewable energy system provides reliable power by combining energy sources.展开更多
In the process of wind power,coal power,and energy storage equipment participating in the operation of industrial microgrids,the stable operation of wind-storage industrial microgrids is guaranteed by considering dema...In the process of wind power,coal power,and energy storage equipment participating in the operation of industrial microgrids,the stable operation of wind-storage industrial microgrids is guaranteed by considering demand response technology and user satisfaction.This paper firstly sorts out the status quo of microgrid operation optimization,and determines themain requirements for user satisfaction considering three types of load characteristics,demand response technology,power consumption benefit loss,user balance power purchase price and wind power consumption evaluation indicators in the system.Secondly,the operation architecture of the windstorage industrialmicrogrid is designed,and themulti-objective optimizationmodel of the wind-storage industrial microgrid is established with the comprehensive operating cost and user satisfaction as the target variables,and the corresponding solution method is mentioned.Finally,a typical wind-storage industrial microgrid is selected for simulation analysis,and the results showthat,(1)Considering the demand response technology,the comprehensive operating cost of the wind-storage industrial microgrid per day is 5292.63 yuan,the user satisfaction index is 0.953,and the wind power consumption rate reaches 100%.(2)By setting four scenarios,it highlights that the grid-connected operation mode is superior to the off-grid operation mode.Considering the demand response technology,the load curve can be optimized,and the time-of-use electricity price can be fully used to coordinate the operation of each unit,which enhances the wind power consumption capacity.The compromise solution of the system comprehensive operating cost and user satisfaction under the confidence level of 0.95 is obtained,namely(5343.22,0.94).(3)The frontier curve shows that in the process of model solving,it is impossible to optimize any sub-objective by changing the control variables,which proves that there is a close relationship between the comprehensive operating cost of the system and the confidence level,whic展开更多
This paper proposes the generation scheduling approach for a microgrid comprised of conventional generators, wind energy generators, solar photovoltaie (PV) systems, battery storage, and electric vehicles. The elect...This paper proposes the generation scheduling approach for a microgrid comprised of conventional generators, wind energy generators, solar photovoltaie (PV) systems, battery storage, and electric vehicles. The electrical vehicles (EVs) play two different roles: as load demands during charging, and as storage units to supply energy to remaining load demands in the MG when they are plugged into the microgrid (MG). Wind and solar PV powers are intermittent in nature; hence by including the battery storage and EVs, the MG becomes more stable. Here, the total cost objective is minimized considering the cost of conventional generators, wind generators, solar PV systems and EVs. The proposed optimal scheduling problem is solved using the hybrid differential evolution and harmony search (hybrid DE-HS) algorithm including the wind energy generators and solar PV system along with the battery storage and EVs. Moreover, it requires the least investment.展开更多
The world is heading towards renewable energy, but the two key disputes that stop its well-known adoption are the power production level and the price of the production. Distributed generation (DG), and hybrid systems...The world is heading towards renewable energy, but the two key disputes that stop its well-known adoption are the power production level and the price of the production. Distributed generation (DG), and hybrid systems with battery backup are the solution for uninterrupted power supply. It is obtained using the Multi-Objective Genetic Algorithm (NSGA II). Techno-economic methodology is used in this proposed system for the size optimization. The result is based on the system cost, in order to meet the load requirements. The effect of temporal sampling is optimized using low-rate temporal data. It is compared with hybrid DC microgrid, which has been optimized using high temporal resolution data.展开更多
文摘以新能源为主体的微电网系统存在前期资本投入大、电网刚性不足等问题,特别是离网型微电网由于失去大电网的支撑,安全稳定运行面临更大的挑战。本文针对离网型交流微电网设计了双层调度策略,即经济最优化日前调度和日内稳定运行实时调度,在多时间尺度下灵活规划发电主体出力。首先,日前调度以微电网经济性运行为目标,利用全生命周期理论建立经济模型,计及储能电池荷电状态(state of charge,SOC)对寿命的影响;其次,日内实时调度以供电稳定性为目标,充分考虑预测误差给系统带来的可能性崩溃,利用储能PQ源实时修正VF源的功率偏差,改善储能VF源的健康状态;最后,通过算例仿真,得到满足微电网经济、稳定运行的综合优化调度方案,并验证了该策略的有效性和合理性。
文摘The growing interest in energy conservation has inspired companies to seek alternatives to highly polluting fuel electricity generation. This study designed an optimised solar wind power generation system to fulfil the energy requirement of a cold chain logistics centre. This study first conducted a thorough analysis of the clarity indicators and daily temperature positions of the cold chain logistics centre, determined the average daily electricity demand, and proposed an effective design scheme. The energy simulation software, RETScreen 8.0, was used to determine the scale of solar photovoltaic and wind power projects that meet the expected energy needs of the cold chain logistics centre. The results indicated that the estimated annual total energy demand was 833689.2 kWh. The annual power generation of 6 kW from solar photovoltaic projects and 150 kW from wind power projects was found to be enough to meet the expected electricity demand. Solar photovoltaic power generation and wind power generation account for 2.44% and 97.56%, respectively. The hybrid energy system achieved a 96.6% reduction in carbon emissions and provides a reasonable payback period of 6.1 years and an electricity generation of 904368.674 kWh per year. The feasibility of the project and the calculated period of investment return are very reasonable. Therefore, this hybrid renewable energy system provides reliable power by combining energy sources.
文摘In the process of wind power,coal power,and energy storage equipment participating in the operation of industrial microgrids,the stable operation of wind-storage industrial microgrids is guaranteed by considering demand response technology and user satisfaction.This paper firstly sorts out the status quo of microgrid operation optimization,and determines themain requirements for user satisfaction considering three types of load characteristics,demand response technology,power consumption benefit loss,user balance power purchase price and wind power consumption evaluation indicators in the system.Secondly,the operation architecture of the windstorage industrialmicrogrid is designed,and themulti-objective optimizationmodel of the wind-storage industrial microgrid is established with the comprehensive operating cost and user satisfaction as the target variables,and the corresponding solution method is mentioned.Finally,a typical wind-storage industrial microgrid is selected for simulation analysis,and the results showthat,(1)Considering the demand response technology,the comprehensive operating cost of the wind-storage industrial microgrid per day is 5292.63 yuan,the user satisfaction index is 0.953,and the wind power consumption rate reaches 100%.(2)By setting four scenarios,it highlights that the grid-connected operation mode is superior to the off-grid operation mode.Considering the demand response technology,the load curve can be optimized,and the time-of-use electricity price can be fully used to coordinate the operation of each unit,which enhances the wind power consumption capacity.The compromise solution of the system comprehensive operating cost and user satisfaction under the confidence level of 0.95 is obtained,namely(5343.22,0.94).(3)The frontier curve shows that in the process of model solving,it is impossible to optimize any sub-objective by changing the control variables,which proves that there is a close relationship between the comprehensive operating cost of the system and the confidence level,whic
文摘This paper proposes the generation scheduling approach for a microgrid comprised of conventional generators, wind energy generators, solar photovoltaie (PV) systems, battery storage, and electric vehicles. The electrical vehicles (EVs) play two different roles: as load demands during charging, and as storage units to supply energy to remaining load demands in the MG when they are plugged into the microgrid (MG). Wind and solar PV powers are intermittent in nature; hence by including the battery storage and EVs, the MG becomes more stable. Here, the total cost objective is minimized considering the cost of conventional generators, wind generators, solar PV systems and EVs. The proposed optimal scheduling problem is solved using the hybrid differential evolution and harmony search (hybrid DE-HS) algorithm including the wind energy generators and solar PV system along with the battery storage and EVs. Moreover, it requires the least investment.
文摘The world is heading towards renewable energy, but the two key disputes that stop its well-known adoption are the power production level and the price of the production. Distributed generation (DG), and hybrid systems with battery backup are the solution for uninterrupted power supply. It is obtained using the Multi-Objective Genetic Algorithm (NSGA II). Techno-economic methodology is used in this proposed system for the size optimization. The result is based on the system cost, in order to meet the load requirements. The effect of temporal sampling is optimized using low-rate temporal data. It is compared with hybrid DC microgrid, which has been optimized using high temporal resolution data.