In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak poin...In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak points of the system were found and the theoretical output power was compared. After that we try to get the maximum output power making the correction of collector angle and place suitable panel position.展开更多
文摘In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak points of the system were found and the theoretical output power was compared. After that we try to get the maximum output power making the correction of collector angle and place suitable panel position.