A combination of the rainfall-runoff module of the Xin’anjiang model, the Muskingum routing method, the water stage simulating hydrologic method, the diffusion wave nonlinear water stage method, and the real-time err...A combination of the rainfall-runoff module of the Xin’anjiang model, the Muskingum routing method, the water stage simulating hydrologic method, the diffusion wave nonlinear water stage method, and the real-time error correction method is applied to the real-time flood forecasting and regulation of the Huai River with flood diversion and retarding areas. The Xin’anjiang model is used to forecast the flood discharge hydrograph of the upstream and tributary. The flood routing of the main channel and flood diversion areas is based on the Muskingum method. The water stage of the downstream boundary condition is calculated with the water stage simulating hydrologic method and the water stages of each cross section are calculated from downstream to upstream with the diffusion wave nonlinear water stage method. The input flood discharge hydrograph from the main channel to the flood diversion area is estimated with the fixed split ratio of the main channel discharge. The flood flow inside the flood retarding area is calculated as a reservoir with the water balance method. The faded-memory forgetting factor least square of error series is used as the real-time error correction method for forecasting discharge and water stage. As an example, the combined models were applied to flood forecasting and regulation of the upper reaches of the Huai River above Lutaizi during the 2007 flood season. The forecast achieves a high accuracy and the results show that the combined models provide a scientific way of flood forecasting and regulation for a complex watershed with flood diversion and retarding areas.展开更多
The main purpose of this study was to forecast the inflow to Hongze Lake using the Xin'anjiang rainfall-runoff model. The upper area of Hongze Lake in the Huaihe Basin was divided into 23 sub-basins, including the su...The main purpose of this study was to forecast the inflow to Hongze Lake using the Xin'anjiang rainfall-runoff model. The upper area of Hongze Lake in the Huaihe Basin was divided into 23 sub-basins, including the surface of Hongze Lake. The influence of reservoirs and gates on flood forecasting was considered in a practical and simple way. With a one-day time step, the linear and non-linear Muskingum method was used for channel flood routing, and the least-square regression model was used for real-time correction in flood forecasting. Representative historical data were collected for the model calibration. The hydrological model parameters for each sub-basin were calibrated individually, so the parameters of the Xin'anjiang model were different for different sub-basins. This flood forecasting system was used in the real-time simulation of the large flood in 2005 and the results are satisfactory when compared with measured data from the flood.展开更多
According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimize...According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects.展开更多
In order to accelerate the development of sowing mechanization of virus-free potato minituber,a conical diversion virus-free potato minituber precision seed-metering Device was designed according to the structural cha...In order to accelerate the development of sowing mechanization of virus-free potato minituber,a conical diversion virus-free potato minituber precision seed-metering Device was designed according to the structural characteristics and agronomic requirements of virus-free potato minituber.The device is mainly composed of conical turntable,transmission shaft,outer baffle of seed-metering Device,baffle,seed outlet,seed cleaning device,type hole,etc.The working principle of conical diversion precision seed-metering device for virus-free potato minituber was expounded,and the stress analysis of virus-free potato minituber in each region was carried out.By EDEM discrete element simulation software,the structure of the type hole is optimized to determine the optimal structure of the type hole and according to the physical characteristics of virus-free potato minituber,the single factor experiments of the effects of length of type hole,cone disc speed and cone disc angle on seed filling performance were completed.The orthogonal regression test was carried out with the length of type hole,cone disc speed,and cone disc angle as the test objects,and the leakage rate and qualified rate as the response indexes.The regression models of leakage rate,replay rate,and qualified rate were established,and the parameters of the regression model were optimized.The optimal parameter combination is that the length of type hole is 33.61 mm,the cone disc speed is 6.35 r/min,and the cone disc angle is 26.59°.Bench test was carried out under the optimal conditions,the leakage rate was 3.80%,the replay rate was 0.80%,and the qualified rate was 95.40%,which was basically consistent with the prediction results of the regression model,and met the requirements of precision sowing of virus-free potato minituber.展开更多
基金supported by the National Natural Science Foundation of China (Grant No 50479017)the Program for Changjiang Scholars and Innovative Research Teams in Universities (Grant No IRT071)
文摘A combination of the rainfall-runoff module of the Xin’anjiang model, the Muskingum routing method, the water stage simulating hydrologic method, the diffusion wave nonlinear water stage method, and the real-time error correction method is applied to the real-time flood forecasting and regulation of the Huai River with flood diversion and retarding areas. The Xin’anjiang model is used to forecast the flood discharge hydrograph of the upstream and tributary. The flood routing of the main channel and flood diversion areas is based on the Muskingum method. The water stage of the downstream boundary condition is calculated with the water stage simulating hydrologic method and the water stages of each cross section are calculated from downstream to upstream with the diffusion wave nonlinear water stage method. The input flood discharge hydrograph from the main channel to the flood diversion area is estimated with the fixed split ratio of the main channel discharge. The flood flow inside the flood retarding area is calculated as a reservoir with the water balance method. The faded-memory forgetting factor least square of error series is used as the real-time error correction method for forecasting discharge and water stage. As an example, the combined models were applied to flood forecasting and regulation of the upper reaches of the Huai River above Lutaizi during the 2007 flood season. The forecast achieves a high accuracy and the results show that the combined models provide a scientific way of flood forecasting and regulation for a complex watershed with flood diversion and retarding areas.
基金supported by the National Natural Science Foundation of China (Grant No. 50479017)the Program for Changjiang Scholars and Innovative Research Teams in Universities (Grant No. IRT071)
文摘The main purpose of this study was to forecast the inflow to Hongze Lake using the Xin'anjiang rainfall-runoff model. The upper area of Hongze Lake in the Huaihe Basin was divided into 23 sub-basins, including the surface of Hongze Lake. The influence of reservoirs and gates on flood forecasting was considered in a practical and simple way. With a one-day time step, the linear and non-linear Muskingum method was used for channel flood routing, and the least-square regression model was used for real-time correction in flood forecasting. Representative historical data were collected for the model calibration. The hydrological model parameters for each sub-basin were calibrated individually, so the parameters of the Xin'anjiang model were different for different sub-basins. This flood forecasting system was used in the real-time simulation of the large flood in 2005 and the results are satisfactory when compared with measured data from the flood.
文摘According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects.
基金The work was financially supported by the Major Science and Technology Special Plan of Yunnan Province Subproject(Grant No.2018ZC001-302)the National Innovation Method Work Special Project(Grant No.2018IM030106)the Talent Support Plan in Henan Province(Grant No.ZYQNBJRC2021-04).
文摘In order to accelerate the development of sowing mechanization of virus-free potato minituber,a conical diversion virus-free potato minituber precision seed-metering Device was designed according to the structural characteristics and agronomic requirements of virus-free potato minituber.The device is mainly composed of conical turntable,transmission shaft,outer baffle of seed-metering Device,baffle,seed outlet,seed cleaning device,type hole,etc.The working principle of conical diversion precision seed-metering device for virus-free potato minituber was expounded,and the stress analysis of virus-free potato minituber in each region was carried out.By EDEM discrete element simulation software,the structure of the type hole is optimized to determine the optimal structure of the type hole and according to the physical characteristics of virus-free potato minituber,the single factor experiments of the effects of length of type hole,cone disc speed and cone disc angle on seed filling performance were completed.The orthogonal regression test was carried out with the length of type hole,cone disc speed,and cone disc angle as the test objects,and the leakage rate and qualified rate as the response indexes.The regression models of leakage rate,replay rate,and qualified rate were established,and the parameters of the regression model were optimized.The optimal parameter combination is that the length of type hole is 33.61 mm,the cone disc speed is 6.35 r/min,and the cone disc angle is 26.59°.Bench test was carried out under the optimal conditions,the leakage rate was 3.80%,the replay rate was 0.80%,and the qualified rate was 95.40%,which was basically consistent with the prediction results of the regression model,and met the requirements of precision sowing of virus-free potato minituber.