Distribution networks are commonly used to demonstrate low-voltage problems.A new method to improve voltage quality is using battery energy storage stations(BESSs),which has a four-quadrant regulating capacity.In this...Distribution networks are commonly used to demonstrate low-voltage problems.A new method to improve voltage quality is using battery energy storage stations(BESSs),which has a four-quadrant regulating capacity.In this paper,an optimal dispatching model of a distributed BESS considering peak load shifting is proposed to improve the voltage distribution in a distribution network.The objective function is to minimize the power exchange cost between the distribution network and the transmission network and the penalty cost of the voltage deviation.In the process,various constraints are considered,including the node power balance,single/two-way power flow,peak load shifting,line capacity,voltage deviation,photovoltaic station operation,main transformer capacity,and power factor of the distribution network.The big M method is used to linearize the nonlinear variables in the objective function and constraints,and the model is transformed into a mixed-integer linear programming problem,which significantly improves the model accuracy.Simulations are performed using the modified IEEE 33-node system.A typical time period is selected to analyze the node voltage variation,and the results show that the maximum voltage deviation can be reduced from 14.06%to 4.54%.The maximum peak-valley difference of the system can be reduced from 8.83 to 4.23 MW,and the voltage qualification rate can be significantly improved.Moreover,the validity of the proposed model is verified through simulations.展开更多
Base station operators deploy a large number of distributed photovoltaics to solve the problems of high energy consumption and high electricity costs of 5G base stations.In this study,the idle space of the base statio...Base station operators deploy a large number of distributed photovoltaics to solve the problems of high energy consumption and high electricity costs of 5G base stations.In this study,the idle space of the base station’s energy storage is used to stabilize the photovoltaic output,and a photovoltaic storage system microgrid of a 5G base station is constructed.Aiming at the capacity planning problem of photovoltaic storage systems,a two-layer optimal configuration method is proposed.The inner layer optimization considers the energy sharing among the base station microgrids,combines the communication characteristics of the 5G base station and the backup power demand of the energy storage battery,and determines an economic scheduling strategy for each photovoltaic storage system with the goal of minimizing the daily operation cost of the base station microgrid.The outer model aims to minimize the annual average comprehensive revenue of the 5G base station microgrid,while considering peak clipping and valley filling,to optimize the photovoltaic storage system capacity.The CPLEX solver and a genetic algorithm were used to solve the two-layer models.Considering the construction of the 5G base station in a certain area as an example,the results showed that the proposed model can not only reduce the cost of the 5G base station operators,but also reduce the peak load of the power grid and promote the local digestion of photovoltaic power.展开更多
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co...Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole 展开更多
针对传统的储能调度策略难以取得经济最优的不足,建立了考虑电池寿命损耗的光储充电站储能系统调度模型。首先通过OpenDSS(open distribution system simulation)建立准确的储能、光伏及电动汽车(electric vehicle,EV)充电的底层模型,...针对传统的储能调度策略难以取得经济最优的不足,建立了考虑电池寿命损耗的光储充电站储能系统调度模型。首先通过OpenDSS(open distribution system simulation)建立准确的储能、光伏及电动汽车(electric vehicle,EV)充电的底层模型,模拟充电站日运行情况。其次结合雨流计数法求解出不同运行工况下储能系统的运行年限并折算为电池损耗成本计入优化目标,以此实现光储充电站日充电成本最小。最后利用改进后的粒子群优化(particle swarm optimization,PSO)算法对优化问题进行求解得到经济最优的储能容量配置以及该配置下的储能日运营方案,通过算例仿真验证了模型的可行性并分析了不同储能运营方案对收益与组成成本的影响。展开更多
With the development of renewable energy technologies such as photovoltaics and wind power,it has become a research hotspot to improve the consumption rate of new energy and reduce energy costs through the deployment ...With the development of renewable energy technologies such as photovoltaics and wind power,it has become a research hotspot to improve the consumption rate of new energy and reduce energy costs through the deployment of energy storage.To solve the problem of the interests of different subjects in the operation of the energy storage power stations(ESS)and the integrated energy multi-microgrid alliance(IEMA),this paper proposes the optimization operation method of the energy storage power station and the IEMA based on the Stackelberg game.In the upper layer,ESS optimizes charging and discharging decisions through a dynamic pricing mechanism.In the lower layer,IEMA optimizes the output of various energy conversion coupled devices within the IEMA,as well as energy interaction and demand response(DR),based on the energy interaction prices provided by ESS.The results demonstrate that the optimization strategy proposed in this paper not only effectively balances the benefits of the IEMA and ESS but also enhances energy consumption rates and reduces IEMA energy costs.展开更多
The operation parameters (vibration, shaft displacement and pressure fluctuation) of No. 1 Francis reversible unit of Baoquan pumped-storage power station were measured on site in the no-load mode at net heads of 51...The operation parameters (vibration, shaft displacement and pressure fluctuation) of No. 1 Francis reversible unit of Baoquan pumped-storage power station were measured on site in the no-load mode at net heads of 518.04, 522.01 and 530.38 m, re- spectively. The rotational speed fluctuations in the no-load mode at three net heads were beyond synchronization requirement with obvious S-shaped characteristic, and misaligned guide vanes (MGV) had to be put into use for synchronization. Further analysis demonstrated that the rotating frequency signal was generally dominant in vibration and shaft displacement mixing signal in the no-load mode, while the frequency domain was wide without an obvious main frequency in pressure fluctuation mixing signal. Besides, the SSTκ-ω turbulence model was adopted to simulate the four quadrant characteristic curves of Baoquan model pump-turbine at three gate openings, and the relative error between simulation results and model test data was within ±6%, indicating that the simulation method in this paper is feasible and S-shaped characteristic of the pump-turbine can be simulated with CFD method.展开更多
基金This work was supported by the Science and Technology Project of State Grid Corporation of China“Intelligent Coordination Control and Energy Optimization Management of Super-large Scale Battery Energy Storage Power Station Based on Information Physics Fusion-Simulation Model and Transient Characteristics of Super-large Scale Battery Energy Storage Power Station”(No.DG71-18-009).
文摘Distribution networks are commonly used to demonstrate low-voltage problems.A new method to improve voltage quality is using battery energy storage stations(BESSs),which has a four-quadrant regulating capacity.In this paper,an optimal dispatching model of a distributed BESS considering peak load shifting is proposed to improve the voltage distribution in a distribution network.The objective function is to minimize the power exchange cost between the distribution network and the transmission network and the penalty cost of the voltage deviation.In the process,various constraints are considered,including the node power balance,single/two-way power flow,peak load shifting,line capacity,voltage deviation,photovoltaic station operation,main transformer capacity,and power factor of the distribution network.The big M method is used to linearize the nonlinear variables in the objective function and constraints,and the model is transformed into a mixed-integer linear programming problem,which significantly improves the model accuracy.Simulations are performed using the modified IEEE 33-node system.A typical time period is selected to analyze the node voltage variation,and the results show that the maximum voltage deviation can be reduced from 14.06%to 4.54%.The maximum peak-valley difference of the system can be reduced from 8.83 to 4.23 MW,and the voltage qualification rate can be significantly improved.Moreover,the validity of the proposed model is verified through simulations.
基金supported by the State Grid Science and Technology Project(KJ21-1-56).
文摘Base station operators deploy a large number of distributed photovoltaics to solve the problems of high energy consumption and high electricity costs of 5G base stations.In this study,the idle space of the base station’s energy storage is used to stabilize the photovoltaic output,and a photovoltaic storage system microgrid of a 5G base station is constructed.Aiming at the capacity planning problem of photovoltaic storage systems,a two-layer optimal configuration method is proposed.The inner layer optimization considers the energy sharing among the base station microgrids,combines the communication characteristics of the 5G base station and the backup power demand of the energy storage battery,and determines an economic scheduling strategy for each photovoltaic storage system with the goal of minimizing the daily operation cost of the base station microgrid.The outer model aims to minimize the annual average comprehensive revenue of the 5G base station microgrid,while considering peak clipping and valley filling,to optimize the photovoltaic storage system capacity.The CPLEX solver and a genetic algorithm were used to solve the two-layer models.Considering the construction of the 5G base station in a certain area as an example,the results showed that the proposed model can not only reduce the cost of the 5G base station operators,but also reduce the peak load of the power grid and promote the local digestion of photovoltaic power.
基金funded by the BeijingNatural Science Foundation of China(8222003)National Natural Science Foundation of China(41807180).
文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole
文摘针对传统的储能调度策略难以取得经济最优的不足,建立了考虑电池寿命损耗的光储充电站储能系统调度模型。首先通过OpenDSS(open distribution system simulation)建立准确的储能、光伏及电动汽车(electric vehicle,EV)充电的底层模型,模拟充电站日运行情况。其次结合雨流计数法求解出不同运行工况下储能系统的运行年限并折算为电池损耗成本计入优化目标,以此实现光储充电站日充电成本最小。最后利用改进后的粒子群优化(particle swarm optimization,PSO)算法对优化问题进行求解得到经济最优的储能容量配置以及该配置下的储能日运营方案,通过算例仿真验证了模型的可行性并分析了不同储能运营方案对收益与组成成本的影响。
基金supported by the Guangxi Science and Technology Major Special Project (Project Number GUIKEAA22067079-1).
文摘With the development of renewable energy technologies such as photovoltaics and wind power,it has become a research hotspot to improve the consumption rate of new energy and reduce energy costs through the deployment of energy storage.To solve the problem of the interests of different subjects in the operation of the energy storage power stations(ESS)and the integrated energy multi-microgrid alliance(IEMA),this paper proposes the optimization operation method of the energy storage power station and the IEMA based on the Stackelberg game.In the upper layer,ESS optimizes charging and discharging decisions through a dynamic pricing mechanism.In the lower layer,IEMA optimizes the output of various energy conversion coupled devices within the IEMA,as well as energy interaction and demand response(DR),based on the energy interaction prices provided by ESS.The results demonstrate that the optimization strategy proposed in this paper not only effectively balances the benefits of the IEMA and ESS but also enhances energy consumption rates and reduces IEMA energy costs.
文摘The operation parameters (vibration, shaft displacement and pressure fluctuation) of No. 1 Francis reversible unit of Baoquan pumped-storage power station were measured on site in the no-load mode at net heads of 518.04, 522.01 and 530.38 m, re- spectively. The rotational speed fluctuations in the no-load mode at three net heads were beyond synchronization requirement with obvious S-shaped characteristic, and misaligned guide vanes (MGV) had to be put into use for synchronization. Further analysis demonstrated that the rotating frequency signal was generally dominant in vibration and shaft displacement mixing signal in the no-load mode, while the frequency domain was wide without an obvious main frequency in pressure fluctuation mixing signal. Besides, the SSTκ-ω turbulence model was adopted to simulate the four quadrant characteristic curves of Baoquan model pump-turbine at three gate openings, and the relative error between simulation results and model test data was within ±6%, indicating that the simulation method in this paper is feasible and S-shaped characteristic of the pump-turbine can be simulated with CFD method.