To reduce the cost of backfilling coal mining and utilize the underground space of coal mines,a new backfilling mining method with low backfilling rate called constructional backfilling coal mining(CBCM)is proposed.Th...To reduce the cost of backfilling coal mining and utilize the underground space of coal mines,a new backfilling mining method with low backfilling rate called constructional backfilling coal mining(CBCM)is proposed.The "backfilling body-immediate roof" cooperative bearing structure of CBCM is analyzed by establishing the model of the medium thick plate on an elastic foundation.The influence of the backfilling rate on the stability of overlying strata is analyzed by the numerical simulation experiment.The control effect of CBCM is verified by a physic similar simulation test.The economic benefit of CBCM is analyzed.The conclusions are:the deformation characteristics of the immediate roof and critical backfilling spacing in CBCM can be analyzed based on the Hu Haichang’s theory.Exerting the bearing capacity of the immediate roof is beneficial to the stability of the overlying strata.The CBCM has a good control effect on the overburden in Xinyang Mine when the backfilling rate is lower than 25%.The backfilling cost of per ton coal is 37.39 yuan/t when the backfilling rate is 13.7%,with a decrease rate of 56.63%than the full-filling.The research results can provide theoretical support for the application of CBCM in coal mining.展开更多
Based on the elastic thin plate theory,the main law of the ore roof failure was analyzed and the formula of the ore roof thickness was deduced.The results show that the tensile stress in the roof center accounts for t...Based on the elastic thin plate theory,the main law of the ore roof failure was analyzed and the formula of the ore roof thickness was deduced.The results show that the tensile stress in the roof center accounts for the roof failure.According to the limit failure conditions of the point,the formula of the ore roof thickness was derived.Taking No.10 stope of a bauxite mine as an engineering case,the optimal thickness of the ore roof was 0.36 m.The safety factor was taken as 1.3,therefore the design thickness was 0.5 m.In the whole industrial test process,the dynamic alarm devices did not start the alarm and the ore roof was not damaged.Compared with other stopes under similar conditions,its thickness was reduced by 0.1-0.3 m.The recovery rate of the ore roof was increased by 16.7%-37.5%.展开更多
基金supported by the Youth Funds of National Natural Science Foundation of China(No.52004173)the Distinguished Youth Funds of National Natural Science Foundation of China(No.51925402)+2 种基金the Science and Technology Innovation Project of Colleges and Universities in Shanxi Province(No.2020L0066)the China Postdoctoral Science Foundation(No.2022M712922)the Shanxi-Zheda Institute of Advanced Materials and Chemical Engineering(Nos.2021SX-TD001 and 2022SXTD008).
文摘To reduce the cost of backfilling coal mining and utilize the underground space of coal mines,a new backfilling mining method with low backfilling rate called constructional backfilling coal mining(CBCM)is proposed.The "backfilling body-immediate roof" cooperative bearing structure of CBCM is analyzed by establishing the model of the medium thick plate on an elastic foundation.The influence of the backfilling rate on the stability of overlying strata is analyzed by the numerical simulation experiment.The control effect of CBCM is verified by a physic similar simulation test.The economic benefit of CBCM is analyzed.The conclusions are:the deformation characteristics of the immediate roof and critical backfilling spacing in CBCM can be analyzed based on the Hu Haichang’s theory.Exerting the bearing capacity of the immediate roof is beneficial to the stability of the overlying strata.The CBCM has a good control effect on the overburden in Xinyang Mine when the backfilling rate is lower than 25%.The backfilling cost of per ton coal is 37.39 yuan/t when the backfilling rate is 13.7%,with a decrease rate of 56.63%than the full-filling.The research results can provide theoretical support for the application of CBCM in coal mining.
基金financial support from the National Key Research and Development Program of China(No.2017YFC0602901)。
文摘Based on the elastic thin plate theory,the main law of the ore roof failure was analyzed and the formula of the ore roof thickness was deduced.The results show that the tensile stress in the roof center accounts for the roof failure.According to the limit failure conditions of the point,the formula of the ore roof thickness was derived.Taking No.10 stope of a bauxite mine as an engineering case,the optimal thickness of the ore roof was 0.36 m.The safety factor was taken as 1.3,therefore the design thickness was 0.5 m.In the whole industrial test process,the dynamic alarm devices did not start the alarm and the ore roof was not damaged.Compared with other stopes under similar conditions,its thickness was reduced by 0.1-0.3 m.The recovery rate of the ore roof was increased by 16.7%-37.5%.