Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as resea...Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.展开更多
Close-distance coal seams are widely distributed over China,and the coal pillars left by the overlying coal seams afect the retracement channel of the underlying coal seam in the stopping stage.Based on the engineerin...Close-distance coal seams are widely distributed over China,and the coal pillars left by the overlying coal seams afect the retracement channel of the underlying coal seam in the stopping stage.Based on the engineering background of close-distance seam mining in a coal mine,the reasonable position of the underlying coal seam's stopping line and the support method of the large section roadway during stopping are investigated using feld measurements,similar simulation experiments,and numerical simulations.There are three types of location relationships between the stopping line of the underlying coal seam and the stopping line of the overlying coal seam:"externally staggered with the upper stopping line"(ESUL,stops mining under the overlying goaf),"overlapped with upper stopping line"(OUL),and"internally staggered with the upper stopping line"(ISUL,ISUL-SD for shorter internal staggered distances,ISUL-LD for longer ones).There are diferent stress arch structures in the overlying strata of the above three positions,and the stress arch evolution process exists in the process of ESUL→OUL→ISUL-SD→ISUL-LD:a front and rear double stress arch structure→the front arch gradually decreases→the front arch dies out,and the double arch synthesizes the single arch→the single-arch range expands→the nested double arch.The relationship between the stress arch structure and the position of the stopping line is evaluated as follows:(1)ESUL:the stress concentration in the roof plate of the retracement channel of the underlying coal seam is the highest,because the overburden block of the extensive collapse zone acts directly on the roof plate of the retracement channel,resulting in relative difculties in roof support.(2)OUL:although the retracement channel roof pressure is minimal,the overlying rock structure has the potential for rotation or slippage instability.(3)ISUL-SD:the pressure on the roof of the retracement channel is small and the overburden structure is stable,which is conducive to the safe retraction of the s展开更多
基金financially supported by the Postgraduate Research&Practice Innovation Program of Jiangsu Province(KYCX21_2358)the National Key Research and Development Program of China(2020YFB1314204)National Natural Science Foundation of China(No.52074239)。
文摘Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.
基金supported by the National Natural Science Foundation of China(52004286)the Fundamental Research Funds for the Central Universities(2022XJNY02)+3 种基金the National Natural Science Foundation of China(51974317,52074296)the China Postdoctoral Science Foundation(2020T130701,2019M650895)the Fundamental Research Funds for the Central Universities(2022YJSNY18,2022YJSNY09)all of which were gratefully acknowledged.
文摘Close-distance coal seams are widely distributed over China,and the coal pillars left by the overlying coal seams afect the retracement channel of the underlying coal seam in the stopping stage.Based on the engineering background of close-distance seam mining in a coal mine,the reasonable position of the underlying coal seam's stopping line and the support method of the large section roadway during stopping are investigated using feld measurements,similar simulation experiments,and numerical simulations.There are three types of location relationships between the stopping line of the underlying coal seam and the stopping line of the overlying coal seam:"externally staggered with the upper stopping line"(ESUL,stops mining under the overlying goaf),"overlapped with upper stopping line"(OUL),and"internally staggered with the upper stopping line"(ISUL,ISUL-SD for shorter internal staggered distances,ISUL-LD for longer ones).There are diferent stress arch structures in the overlying strata of the above three positions,and the stress arch evolution process exists in the process of ESUL→OUL→ISUL-SD→ISUL-LD:a front and rear double stress arch structure→the front arch gradually decreases→the front arch dies out,and the double arch synthesizes the single arch→the single-arch range expands→the nested double arch.The relationship between the stress arch structure and the position of the stopping line is evaluated as follows:(1)ESUL:the stress concentration in the roof plate of the retracement channel of the underlying coal seam is the highest,because the overburden block of the extensive collapse zone acts directly on the roof plate of the retracement channel,resulting in relative difculties in roof support.(2)OUL:although the retracement channel roof pressure is minimal,the overlying rock structure has the potential for rotation or slippage instability.(3)ISUL-SD:the pressure on the roof of the retracement channel is small and the overburden structure is stable,which is conducive to the safe retraction of the s