The rain-flow counting method is widely used to compile the fatigue load spectrum, The second stage counting of the rain-flow method is a troublesome process. In order to overcome this drawback, the rain-flow and reve...The rain-flow counting method is widely used to compile the fatigue load spectrum, The second stage counting of the rain-flow method is a troublesome process. In order to overcome this drawback, the rain-flow and reverse rain-flow counting method is proposed in this paper. In this counting method, the rule for counting of the rain-flow method is modified, so that the sequence of load-time need not be adjusted. This is a valid and useful method to count cycles and compile the load spectrum and it can be widely used in ocean engineering.展开更多
Rapid alternating stress is formed in structure subjected to harsh thermal-acoustic loads,which will affect fatigue performance and reduce fatigue life seriously.First,fatigue experiment of superalloy thin-walled stru...Rapid alternating stress is formed in structure subjected to harsh thermal-acoustic loads,which will affect fatigue performance and reduce fatigue life seriously.First,fatigue experiment of superalloy thin-walled structure was carried out to obtain fatigue damage location and failure time of the experiment specimen,and S-iN curves of superalloy thin-walled structure at 723 K were fitted.Then,dynamic response simulation of superalloy thin-walled structure under the same load as experiment was implemented,and fatigue life was estimated based on the fatigue life prediction model which mainly included:improved rain-flow counting method,Morrow average stress model and Miner linear cumulative damage theory.Further,comparisons between simulation solutions and experimental results achieved a consistency,which verified the validity of the Fatigue Life Prediction Model(FLPM).Moreover,taking a rectangle plate as the analysis object,the distributions of Fain-low circulation blocks and damage levels of the structure were discussed respectively.Finally,current research indicates that in pre-buckling the structure is in softened area and fatigue life decreases with the increase of temperature;in post-buckling the structure is in hardened area and fatigue life increases with the increase of temperature within a certain range.展开更多
Water resources management is nowadays a significant stake for the world. However, missing or bad quality of the hydro-climatic historical data available of the studied area makes sometimes hydrological studies diffic...Water resources management is nowadays a significant stake for the world. However, missing or bad quality of the hydro-climatic historical data available of the studied area makes sometimes hydrological studies difficult. Generally, conceptual rain-flow models are designed to bring an appropriate answer with the correction of gaps and prediction of the flows. Historical hydro-climatic data of the Ity station, located on Cavally River, contain gaps which must be bridged. This study aims to establish a rainfall-runoff model through artificial neural networks for filling the gaps into the flow data series of the hydrometric station of Ity on the watershed of Cavally River. A multi-layer perceptron of feed forwards with two entries (monthly average rain and evapotranspiration) and an exit (flows) was established with flow evapotranspiration data. Comparison of the criteria of performance of the various architectures of the neural network model showed that architecture 2-3-1 gives best results. This architecture provides Nash coefficients of 75.79% and correlation linear coefficient of 95.64% for the calibration and Nash coefficients of 73.32% and correlation linear coefficient of 98.33% for the validation. The correlations between simulated flows and observed flows are strong. The correlation coefficients are 83.89% and 83.08% respectively for the calibration and validation.展开更多
商业园区中安装电池储能电站(battery energy storage statin,BESS)能够削减用电高峰负荷,提高园区用电经济效益,但现有控制策略较为单一,难以适应未来的大规模发展与应用。为此,以商业园区储能电站为主要研究对象,提出一种考虑电池寿...商业园区中安装电池储能电站(battery energy storage statin,BESS)能够削减用电高峰负荷,提高园区用电经济效益,但现有控制策略较为单一,难以适应未来的大规模发展与应用。为此,以商业园区储能电站为主要研究对象,提出一种考虑电池寿命的商业园区储能电站多目标运行控制策略。首先建立了基于雨流计数法的电池充放电循环次数统计方法,然后采用5阶函数拟合电池循环寿命与放电深度的关系,以此估算电池寿命衰减情况并将其作为控制子目标函数之一,达到延缓电池寿命衰减的目的。依据所提出的储能电站控制策略,基于园区分布式光伏及负荷功率预测曲线,采用遗传算法以10 min为优化区间、每隔1 min对储能系统充放电功率进行一次滚动优化,实现了储能电站的时序分钟级控制。最后,以上海某商业园区夏季典型日为例,验证了控制策略的有效性与优越性。展开更多
基金The project was financially supported by the National Natural Science Foundation of China (Grant No. 50078010)
文摘The rain-flow counting method is widely used to compile the fatigue load spectrum, The second stage counting of the rain-flow method is a troublesome process. In order to overcome this drawback, the rain-flow and reverse rain-flow counting method is proposed in this paper. In this counting method, the rule for counting of the rain-flow method is modified, so that the sequence of load-time need not be adjusted. This is a valid and useful method to count cycles and compile the load spectrum and it can be widely used in ocean engineering.
基金co-supported by Aviation Basic Science Fund Project of China(No.20151554002)Natural Sciences Key Project of Chengdu Aeronautic Polytechnic in China(No.061754)Natural Sciences General Project of Sichuan Province Education Department in China(No.18ZB0057).
文摘Rapid alternating stress is formed in structure subjected to harsh thermal-acoustic loads,which will affect fatigue performance and reduce fatigue life seriously.First,fatigue experiment of superalloy thin-walled structure was carried out to obtain fatigue damage location and failure time of the experiment specimen,and S-iN curves of superalloy thin-walled structure at 723 K were fitted.Then,dynamic response simulation of superalloy thin-walled structure under the same load as experiment was implemented,and fatigue life was estimated based on the fatigue life prediction model which mainly included:improved rain-flow counting method,Morrow average stress model and Miner linear cumulative damage theory.Further,comparisons between simulation solutions and experimental results achieved a consistency,which verified the validity of the Fatigue Life Prediction Model(FLPM).Moreover,taking a rectangle plate as the analysis object,the distributions of Fain-low circulation blocks and damage levels of the structure were discussed respectively.Finally,current research indicates that in pre-buckling the structure is in softened area and fatigue life decreases with the increase of temperature;in post-buckling the structure is in hardened area and fatigue life increases with the increase of temperature within a certain range.
文摘Water resources management is nowadays a significant stake for the world. However, missing or bad quality of the hydro-climatic historical data available of the studied area makes sometimes hydrological studies difficult. Generally, conceptual rain-flow models are designed to bring an appropriate answer with the correction of gaps and prediction of the flows. Historical hydro-climatic data of the Ity station, located on Cavally River, contain gaps which must be bridged. This study aims to establish a rainfall-runoff model through artificial neural networks for filling the gaps into the flow data series of the hydrometric station of Ity on the watershed of Cavally River. A multi-layer perceptron of feed forwards with two entries (monthly average rain and evapotranspiration) and an exit (flows) was established with flow evapotranspiration data. Comparison of the criteria of performance of the various architectures of the neural network model showed that architecture 2-3-1 gives best results. This architecture provides Nash coefficients of 75.79% and correlation linear coefficient of 95.64% for the calibration and Nash coefficients of 73.32% and correlation linear coefficient of 98.33% for the validation. The correlations between simulated flows and observed flows are strong. The correlation coefficients are 83.89% and 83.08% respectively for the calibration and validation.