期刊文献+
共找到10篇文章
< 1 >
每页显示 20 50 100
High performance power-configurable preamplifier in a high-density parallel optical receiver 被引量:1
1
作者 Wang XiaoXia Wang Zhigong 《Journal of Semiconductors》 EI CAS CSCD 2012年第1期101-106,共6页
A power-configurable high performance preamplifier was implemented in standard 180-nm CMOS technology for 12 × 10 Gb/s high-density ultra-high speed parallel optical communication system. With critical limitation... A power-configurable high performance preamplifier was implemented in standard 180-nm CMOS technology for 12 × 10 Gb/s high-density ultra-high speed parallel optical communication system. With critical limitations on power consumption, area and fabrication cost, the preamplifier achieves high performance, e.g. high bandwidth, high trans-impedance gain, low noise and high stability. A novel feed-forward common gate (FCG) stage is adopted to alleviate contradictions on trans-impedance gain and bandwidth by using a low headroom con- suming approach to isolate a large input capacitance and using complex pole peaking techniques to substitute induc- tors to achieve bandwidth extension. A multi-supply power-configurable scheme was employed to avoid wasteful power caused by a pessimistic estimation of process-voltage-temperature (PVT) variation. Two representative sam- ples provide a trans-impedance gain of 53.9 dBf2, a 3-dB bandwidth of 6.8 GHz, a power dissipation of 6.26 mW without power-configuration and a trans-impedance gain of 52.1 dBg2, a 3-dB bandwidth of 8.1 GHz, a power dis- sipation of 6.35 mW with power-configuration, respectively. The measured average input-referred noise-current spectral density is no more than 28 pA/√Hz. The chip area is only 0.08 x 0.08 mm2. 展开更多
关键词 PREAMPLIFIER parallel optical receiver low power low cost feed-forward common-gate (simplified FCG) stage power-configurable
原文传递
体系结构级功耗分析方法 被引量:5
2
作者 李佳 徐勇军 +1 位作者 李晓维 王新平 《系统仿真学报》 EI CAS CSCD 2004年第12期2821-2824,2827,共5页
功耗问题已经成为集成电路设计,尤其是嵌入式系统和电池供电设备开发中所要关注的重要问题。电路设计较低层次的功耗分析方法能提供比较好的准确性,但它们的功耗模型相对复杂,功耗分析的时间开销和内存开销都很大。本文所讨论的体系结... 功耗问题已经成为集成电路设计,尤其是嵌入式系统和电池供电设备开发中所要关注的重要问题。电路设计较低层次的功耗分析方法能提供比较好的准确性,但它们的功耗模型相对复杂,功耗分析的时间开销和内存开销都很大。本文所讨论的体系结构级功耗分析方法就克服了这些缺点,通过对可配置的功能单元分别进行功耗建模,基于准确的性能模拟来达到功耗模拟的目的,它可以广泛应用于体系结构、指令集、编译器以至软件的低功耗优化中,文章最后借助于通用CPU的系统级功耗模拟工具Wattch,研究了指令及数据缓存在配置方方法的功耗行为,实验证明,体系结构级的功耗分析为低功耗系统设计提供了更有价值的指导。 展开更多
关键词 低功耗设计 体系结构级功耗分析 功耗可配置体系结构 低功耗优化
下载PDF
氧化物阴极荧光灯生产中的工频方法
3
作者 陈索然 《中国照明电器》 2012年第11期9-11,15,共4页
现有的工频预热阴极荧光灯和高频预热阴极荧光灯都属于氧化物阴极荧光灯。针对氧化物阴极荧光灯生产中的工频方法进行探讨,供同行参考。
关键词 工频配置法 工频老炼法 工频测控法
原文传递
A single die 1.2 V 55 to 95 dB DR delta sigma ADC with configurable modulator and OSR
4
作者 武海军 李斌 +2 位作者 张华斌 李正平 曾隆月 《Journal of Semiconductors》 EI CAS CSCD 2014年第3期116-121,共6页
A single die 1.2 V multi-stage noise shaping(Mash) 2-2 delta sigma analog to digital converter(ADC)for wide applications is implemented. The configurable Mash 2-2 modulator with a new decimation filter design is p... A single die 1.2 V multi-stage noise shaping(Mash) 2-2 delta sigma analog to digital converter(ADC)for wide applications is implemented. The configurable Mash 2-2 modulator with a new decimation filter design is presented to achieve wide and high dynamic range(DR) for multiple practical applications. The novel modulator can be configured as a Mash 2-2 modulator for high precision or a 2-order modulator for low DR. The decimation filter is designed to select the OSR flexibly among cascaded integrator comb(CIC) filter and two half-band filters(HBF). The serial peripheral interface(SPI) can be used to adjust the sampling frequency and the oversampling ratio(OSR). The design was fabricated in a 0.13 m CMOS process with an area of 0.91 mm2and a total power of 5.2 mW. The measurement results show that the dynamic range(DR) of the proposed ADC can change from 55to 95 dB with the configurable OSR from 16 to 256. The spurious free dynamic range(SFDR) and signal-to-noise distortion ratio(SNDR) can get 99 dB and 86.5 dB, respectively. 展开更多
关键词 delta sigma ADC modulator low power decimation filter configurable OSR
原文传递
起落架的分布系统设计
5
作者 高志 雷建和 +2 位作者 张丹 聂余满 王芳芳 《自动化应用》 2014年第8期3-5,8,共4页
针对传统的飞机起落架集中式控制系统布线复杂、线束成本高、可靠性相对较低等不足,提出一种分布式起落架控制系统,并介绍其总线协议、拓扑结构、配电配置等。
关键词 分布式控制系统 总线协议 拓扑结构 配电配置
下载PDF
变结构电力系统短路故障的通用算法 被引量:12
6
作者 吕飞鹏 米麟书 姜可薰 《电力系统自动化》 EI CSCD 北大核心 1993年第9期19-23,共5页
提出了计算变结构电力系统短路故障的通用算法,可快速进行系统母线处或输电线路(包括互感线路)上任意位置处的各型短路故障电气量值的计算,具有模型精确、算法统一、简捷直观、计算量少等特点。
关键词 电力系统 计算 短路故障
下载PDF
“新海旭”全球最大非自航重型绞吸挖泥船 被引量:4
7
作者 何炎平 刘亚东 +3 位作者 赵永生 谷孝利 李铭志 黄超 《船舶工程》 CSCD 北大核心 2018年第9期1-5,51,共6页
文章介绍了国内自2010年以来建成的四型有代表意义的非自航大型绞吸挖泥船和国外最大的两艘非自航绞吸挖泥船,可以看到国内自主研制能力已经步入国际领先行列。集成船舶设计通用原理和绞吸挖泥船专业疏浚设备开发技术,用图形的方式表示... 文章介绍了国内自2010年以来建成的四型有代表意义的非自航大型绞吸挖泥船和国外最大的两艘非自航绞吸挖泥船,可以看到国内自主研制能力已经步入国际领先行列。集成船舶设计通用原理和绞吸挖泥船专业疏浚设备开发技术,用图形的方式表示了该船型设计的主要方面。扼要介绍了"新海旭"的总布置、航区、动力配置、疏浚输送系统和钢桩台车定位系统等,并对大型绞吸挖泥船的作业航区、动力配置方案和疏浚输送系统生产能力等进行了探讨和分析。论文提出的绞吸挖泥船设计原理和对"新海旭"的技术状态介绍可供开发大型绞吸挖泥船参考。 展开更多
关键词 绞吸挖泥船 设计原理 总布置 动力配置 钢桩台车 生产能力
原文传递
合肥电网220kV板桥变电站无功配置分析 被引量:3
8
作者 叶斌 葛斐 王莉娅 《安徽电力》 2011年第2期22-24,共3页
规划的板桥变电站作为合肥市一环以内第1座220 kV变电站,采用全电缆出线,产生的充电功率较大,而周围变电站均未预留电抗器接入的可能性。考虑在板桥变电站集中配置电抗器以补偿周边电网盈余的无功功率,同时在尽量充分利用线路充电功率... 规划的板桥变电站作为合肥市一环以内第1座220 kV变电站,采用全电缆出线,产生的充电功率较大,而周围变电站均未预留电抗器接入的可能性。考虑在板桥变电站集中配置电抗器以补偿周边电网盈余的无功功率,同时在尽量充分利用线路充电功率的基础上,减少站内电容器补偿容量;并结合电压水平和功率因数的要求,研究合理的无功配置方案,通过计算校验配置方案的合理性。 展开更多
关键词 合肥电网 板桥变电站 无功配置 无功平衡 功率因数 电容器 电抗器
下载PDF
动力配置对2万吨重载列车纵向冲动的影响研究 被引量:3
9
作者 胡晓宇 閤鑫 +3 位作者 周占松 凌亮 王开云 陈清华 《四川轻化工大学学报(自然科学版)》 CAS 2022年第4期18-25,共8页
为研究十二轴机车的引入对2万吨重载组合列车循环制动过程中纵向冲动的影响,基于纵向动力学理论,建立列车纵向动力学仿真模型,计算在长大下坡道进行循环制动过程中,“八轴机车+八轴机车”、“十二轴机车+八轴机车”和“八轴机车+十二轴... 为研究十二轴机车的引入对2万吨重载组合列车循环制动过程中纵向冲动的影响,基于纵向动力学理论,建立列车纵向动力学仿真模型,计算在长大下坡道进行循环制动过程中,“八轴机车+八轴机车”、“十二轴机车+八轴机车”和“八轴机车+十二轴机车”3种动力配置下列车的车钩力和纵向加速度,并对比分析不同电制动力作用下该3种动力配置编组列车的纵向冲动差异。结果表明:2万吨重载列车在长大下坡道循环制动时,车钩力会出现拉压转换现象,最大车钩力主要在中部机车及其附近产生;在较大电制动力条件下,与“八轴机车+八轴机车”编组列车相比,“十二轴机车+八轴机车”编组列车在循环制动时产生的最大拉钩力显著减小,而“八轴机车+十二轴机车”编组列车产生的最大拉钩力、最大压钩力和最大纵向加速度均有所增大;3种动力配置编组下,列车循环制动过程中的最大压钩力和纵向加速度均随着电制动力增大而增大,最大拉钩力变化较小。 展开更多
关键词 纵向动力学 2万吨重载组合列车 动力配置 纵向冲动 十二轴机车 八轴机车
下载PDF
全电缆出线变电站扩建无功补偿配置工程实践分析 被引量:2
10
作者 郑志杰 赵龙 +2 位作者 贾善杰 王艳 张雯 《山东电力技术》 2017年第8期35-38,48,共5页
随着城市的发展,城市中心区110 kV变电站多数采用全电缆出线,充电功率较大。而由于历史原因,部分城区110 kV变电站未预留电抗器布置条件,造成电压调整困难。以某110 kV站扩建为例,研究城区全电缆出线110 kV变电站改扩建无功配置方案;考... 随着城市的发展,城市中心区110 kV变电站多数采用全电缆出线,充电功率较大。而由于历史原因,部分城区110 kV变电站未预留电抗器布置条件,造成电压调整困难。以某110 kV站扩建为例,研究城区全电缆出线110 kV变电站改扩建无功配置方案;考虑周边变电站实际运行现状,在变电站配置低压电抗器以补偿电网小方式运行条件下的盈余无功功率;考虑充分利用电缆线路的充电功率,减少站内电容器补偿容量;结合远景规划、现状及二期扩建需求,研究合理的无功配置方案。通过平衡分析,提出了变电站无功补偿调整配置思路,对同类型的变电站具有借鉴意义。 展开更多
关键词 无功配置 无功平衡 电容器 电抗器
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部