Predicting the responses of an alluvial channel to changes in flow and sediment supply is essential for engineering design. Many methods have been developed in the last few decades to describe sectional bankfull chara...Predicting the responses of an alluvial channel to changes in flow and sediment supply is essential for engineering design. Many methods have been developed in the last few decades to describe sectional bankfull characteristics(elevation and discharge); however, studies on long-term reach-scale bankfull discharge are still limited. In this study, a hydraulic model is built to calculate the reach-scale bankfull discharge, and the effects of reservoir building on downstream bankfull discharges are discussed. The studied river reach is located at the lower Wei River(WR), where the planned Dongzhuang Reservoir would be built on its largest tributary, the Jing River. A quasi-two-dimensional numerical model coupled with a bankfull discharge estimating method is put forward to calculate the reach-scale bankfull discharge. The soundness of the model is verified. Results show that the temporal variation of reach-scale bankfull discharge of the lower reach of the WR would be highly influenced by the planned reservoir, especially during the first 20 years of operation. The effect of the planned reservoir on bankfull discharge may reach its maximum when the total trapped sediment load reaches approximately 75% of the reservoir capacity. Our results show that after the first 17 years of operation,the effect of the planned reservoir on bankfull discharge of the river reach may decrease gradually.The soundness and predictive capability of the coupled model have also been calibrated by comparing with existing reservoirs. All analyses indicate that the numerical model can be used to predict the changed reach-scale bankfull discharge of the lower WR.展开更多
In order to protect the city of New Orleans from the Mississippi River flooding, the Bonnet Carré Spillway (BCS) was constructed from 1929 to 1936 to divert flood water from the river into Lake Pontchartrain and ...In order to protect the city of New Orleans from the Mississippi River flooding, the Bonnet Carré Spillway (BCS) was constructed from 1929 to 1936 to divert flood water from the river into Lake Pontchartrain and then into the Gulf of Mexico. During the BCS opening for flood release, large amounts of freshwater, nutrients, sediment, etc. were discharged into Lake Pontchartrain, and caused a lot of environmental problems. To evaluate the environmental impacts of the flood water on lake ecosystems, a two-dimensional numerical model was developed based on CCHE2D and applied to simulate the flow circulation, sediment transport and algal biomass distribution in Lake Pontchartrain. The effect of sediment concentration on the growth of algae was considered in the model. The numerical model was calibrated using field measured data provided by USGS, and then it was validated by the BCS Opening Event in 1997. The simulated results were generally in good agreement with filed data and satellite imagery. The field observation and numerical model show that during the spillway opening for flood release, the sediment concentration is very high, which greatly restricts the growth of algae, so there is no algal bloom observed in the lake. After the closure of BCS, the sediment concentration in the lake reduces gradually, and the nutrient concentration of the lake is still high. Under these conditions, numerical results and satellite imagery showed that the chlorophyll concentration was high and algal bloom might occur.展开更多
基金funded by the National Natural Science Foundation of China(Grants No.2011CB403305,51579230,51109198,41571005,and 51479179)
文摘Predicting the responses of an alluvial channel to changes in flow and sediment supply is essential for engineering design. Many methods have been developed in the last few decades to describe sectional bankfull characteristics(elevation and discharge); however, studies on long-term reach-scale bankfull discharge are still limited. In this study, a hydraulic model is built to calculate the reach-scale bankfull discharge, and the effects of reservoir building on downstream bankfull discharges are discussed. The studied river reach is located at the lower Wei River(WR), where the planned Dongzhuang Reservoir would be built on its largest tributary, the Jing River. A quasi-two-dimensional numerical model coupled with a bankfull discharge estimating method is put forward to calculate the reach-scale bankfull discharge. The soundness of the model is verified. Results show that the temporal variation of reach-scale bankfull discharge of the lower reach of the WR would be highly influenced by the planned reservoir, especially during the first 20 years of operation. The effect of the planned reservoir on bankfull discharge may reach its maximum when the total trapped sediment load reaches approximately 75% of the reservoir capacity. Our results show that after the first 17 years of operation,the effect of the planned reservoir on bankfull discharge of the river reach may decrease gradually.The soundness and predictive capability of the coupled model have also been calibrated by comparing with existing reservoirs. All analyses indicate that the numerical model can be used to predict the changed reach-scale bankfull discharge of the lower WR.
文摘In order to protect the city of New Orleans from the Mississippi River flooding, the Bonnet Carré Spillway (BCS) was constructed from 1929 to 1936 to divert flood water from the river into Lake Pontchartrain and then into the Gulf of Mexico. During the BCS opening for flood release, large amounts of freshwater, nutrients, sediment, etc. were discharged into Lake Pontchartrain, and caused a lot of environmental problems. To evaluate the environmental impacts of the flood water on lake ecosystems, a two-dimensional numerical model was developed based on CCHE2D and applied to simulate the flow circulation, sediment transport and algal biomass distribution in Lake Pontchartrain. The effect of sediment concentration on the growth of algae was considered in the model. The numerical model was calibrated using field measured data provided by USGS, and then it was validated by the BCS Opening Event in 1997. The simulated results were generally in good agreement with filed data and satellite imagery. The field observation and numerical model show that during the spillway opening for flood release, the sediment concentration is very high, which greatly restricts the growth of algae, so there is no algal bloom observed in the lake. After the closure of BCS, the sediment concentration in the lake reduces gradually, and the nutrient concentration of the lake is still high. Under these conditions, numerical results and satellite imagery showed that the chlorophyll concentration was high and algal bloom might occur.