The environmental challenges from coal mining include coal mine accidents,land subsidence,damage to the water environment,mining waste disposal and air pollution.These are either environmental pollution or landscape c...The environmental challenges from coal mining include coal mine accidents,land subsidence,damage to the water environment,mining waste disposal and air pollution.These are either environmental pollution or landscape change.A conceptual framework for solving mine environmental issues is proposed.Clean processes,or remediation measures,are designed to address environmental pollution.Restoration measures are proposed to handle landscape change.The total methane drainage from 56 Chinese high methane concentration coal mines is about 101.94 million cubic meters.Of this methane,19.32 million,35.58 million and 6.97 million cubic meters are utilized for electricity generation,civil fuel supplies and other industrial purposes,respectively.About 39% of the methane is emitted into the atmosphere.The production of coal mining wastes can be decreased 10% by reuse of mining wastes as underground fills,or by using the waste as fuel for power plants or for raw material to make bricks or other infrastructure materials.The proper use of mined land must be decided in terms of local physical and socio-economical conditions.In European countries more than 50% of previously mined lands are reclaimed as forest or grass lands.However,in China more than 70% of the mined lands are reclaimed for agricultural purposes because the large population and a shortage of farmlands make this necessary.Reconstruction of rural communities or native residential improvement is one environmental problem arising from mining.We suggest two ways to reconstruct a farmer's house in China.展开更多
Ⅰ. INTRODUCTION Bednorz and Müller have discovered possible superconductivity around 35K in Ba-La-Cu-O systems. Uchida and Takagi et al. have observed Meissner effect and determined superconductivity in the syst...Ⅰ. INTRODUCTION Bednorz and Müller have discovered possible superconductivity around 35K in Ba-La-Cu-O systems. Uchida and Takagi et al. have observed Meissner effect and determined superconductivity in the system. Within a few months, several groups have reported their successful results. Chu et al. pushed the T_c(onset) of Ba-La-Cu-O to 52K under hydrostatic pressure. Cava et al. obtained nearly single superconducting phase展开更多
Dynamic analysis steps and general flow of fast lagrangian analysis of continua in 3 dimensions(FLAC3D) were discussed. Numerical simulation for influence of excavation and blasting vibration on stability of mined-out...Dynamic analysis steps and general flow of fast lagrangian analysis of continua in 3 dimensions(FLAC3D) were discussed. Numerical simulation for influence of excavation and blasting vibration on stability of mined-out area was carried out with FLAC3D. The whole analytical process was divided into two steps, including the static analysis and the dynamic analysis which were used to simulate the influence of excavation process and blasting vibration respectively. The results show that the shape of right upper boundary is extremely irregular after excavation, and stress concentration occurs at many places and higher tensile stress appears. The maximum tensile stress is higher than the tensile strength of rock mass, and surrounding rock of right roof will be damaged with tension fracture. The maximum displacement of surrounding rock is 4.75 mm after excavation. However, the maximum displacement increases to 5.47 mm after the blasting dynamic load is applied. And the covering area of plastic zones expands obviously, especially at the foot of right upper slope. The analytical results are in basic accordance with the observed results on the whole. Damage and disturbance on surrounding rock to some degree are caused by excavation, while blasting dynamic load increases the possibility of occurrence of dynamic instability and destruction further. So the effective supporting and vibration reducing measures should be taken during mining.展开更多
The surface subsidence is a common environmental hazard in mined-out area. Based on careful analysis of the regularity of surface subsidence in mined-out area, we proposed a new time function based on Harris curve mod...The surface subsidence is a common environmental hazard in mined-out area. Based on careful analysis of the regularity of surface subsidence in mined-out area, we proposed a new time function based on Harris curve model in consideration of the shortage of current surface subsidence time functions. By analyzing the characteristics of the new time function, we found that it could meet the dynamic process, the velocity change process and the acceleration change process during surface subsidence. Then its rationality had been verified through project cases. The results show that the proposed time function model can give a good reflection of the regularity of surface subsidence in mined-out area and can accurately predict surface subsidence. And the prediction data of the model are a little greater than measured data on condition of proper measured data quantity, which is safety in the engineering. This model provides a new method for the analysis of surface subsidence in mined-out area and reference for future prediction, and it is valuable to engineering application.展开更多
Rock mass is fractured media. Its fracture is a nonlinear process. Theaccumulation of acoustic emission (AF) is closely related to the degree of damage. The dynamicsproblem is simply described based on the non-equilib...Rock mass is fractured media. Its fracture is a nonlinear process. Theaccumulation of acoustic emission (AF) is closely related to the degree of damage. The dynamicsproblem is simply described based on the non-equilibrium statistical theory of crack evolvement,trying to use the hybrid analysis of the statistical theory and scan electron microscopy (SEM), thecharacters of AE signals from rock damage in a mined-out area is synthetically analyzed andevaluated. These provide an evidence to reverse deduce and accurately infer the position of rockfracture for dynamical hazard control.展开更多
There were differences between real boundary and blast hole controlling boundary of irregular mined-out area in underground metal mines. There were errors in numerical analysis of stability for goaf, if it was analyze...There were differences between real boundary and blast hole controlling boundary of irregular mined-out area in underground metal mines. There were errors in numerical analysis of stability for goaf, if it was analyzed as regular 3D mined-out area and the influence of coupling stress-seepage-disturbance was not considered adequately. Taking a lead zinc mine as the background, the model was built by the coupling of Surpac and Midas-Gts based on the goaf model precisely measured by CMS.According to seepage stress fundamental equations based on the equivalent continuum mechanical and the theory about equivalent load of dynamic disturbance in deep-hole blasting, the stability of mined-out area under multi-field coupling of stress-seepage-dynamic disturbance was numerically analyzed. The results show that it is more consistent between the numerical analysis model based on the real model of irregular 3D shape goaf and the real situation, which could faithfully reappear the change rule of stress–strain about the surrounding rock under synthetic action of blasting dynamic loading and the seepage pressure. The mined-out area multi-field coupling formed by blasting excavation is stable. Based on combination of the advantages of the CMS,Surpac and Midas-Gts, and fully consideration of the effects of multi-field coupling, the accurate and effective way could be provided for numerical analysis of stability for mined-out area.展开更多
The engineering and geological characteristics of a steep slope consisting of coal gangue, rock and soil medium in Huating coal mine have been comprehensively investigated. Owing to humid weather, heavy rainfall, vege...The engineering and geological characteristics of a steep slope consisting of coal gangue, rock and soil medium in Huating coal mine have been comprehensively investigated. Owing to humid weather, heavy rainfall, vegetation and porous characteristics of the soil and rock mass, the steep slope will be destabilized and induce mud-rock flow or derive hazard easily. Firstly, based on the classical slope reinforcement theory, some regularity between the shear and displacement in the destabilized zone of the slope with or without root strength contribution is presented. Then, based on the experimental and statistical analysis of root strength, hydrological characteristics and stability status, etc., some possible biotechnical techniques for reinforcement of the steep slope have been suggested. These methods are important for quantitative analysis of destabilization of the slope and design of the biotechnical reinforcement.展开更多
To identify the instability on large scale underground mined-out area in the metal mine effectively,the parameters of radial basis function were determined through clustering method and the improved fuzzy radial basis...To identify the instability on large scale underground mined-out area in the metal mine effectively,the parameters of radial basis function were determined through clustering method and the improved fuzzy radial basis function neural network(FRBFNN)model of instability identification model about large scale underground mined-out area in the metal mine was built.The improved FRBFNN model was trained and tested.The results show that the improved FRBFNN model has high training accuracy and generalization ability.Parameters such as pillar area ratio,filling level and the value of rock quality designation have strong influence on instability of large scale underground mined-out area.Correctness of analysis about the improved FRBFNN model was proved by the practical application results about instability discrimination of surrounding rock in large-scale underground mined-out area of a metal mine in south China.展开更多
In underground coal mines, fibre reinforced polymer(FRP) bolt is ideal for mined rib reinforcements as it can prevent gas explosions caused by shearer frictional spark. With increasing mining depth, small diameter FRP...In underground coal mines, fibre reinforced polymer(FRP) bolt is ideal for mined rib reinforcements as it can prevent gas explosions caused by shearer frictional spark. With increasing mining depth, small diameter FRP bolts used in shallow underground mining cannot fulfil the rib support requirements. Under the engineering background of deep underground shortwall mining in Wudong coal mine, this paper systematically studies Φ27 mm FRP bolt support for large deformation coal rib. Specimens with a fan-shaped cross-section were used to enable the tensile testing of the bolt rod, the measured average tensile strength of the studied FRP bolt was(486.1 ± 9.6) MPa with a maximum elongation of 5.7%±0.6%.The shear strength of the bolt was measured as approximately 258 MPa using a self-made double shear testing apparatus. Based on the equivalent radial stiffness principle, a laboratory short encapsulation pullout test(SEPT) method for rib bolting has been developed undertaken consideration of the mechanical properties of the coal seam. Results showed that the average peak anchorage forces of the Φ27 mm FRP bolt and Φ20 mm steel rebar bolt were 108.4 and 66.4 k N, respectively, which were agreed with the theoretical calculations and field measurements. Based on theoretical analysis of the loading states of the bolt under site conditions, bolting method of full-length resin grouting was adopted to offset the weaknesses of the FRP bolt. Numerical method was employed to compare the bolting effect using Φ27 mm FRP bolts and steel rebar bolts. Large diameter FRP bolting was determined as the optimum rib support scheme to increase the productivity of the coal mine and to enhance the ground control capability for+425 level mining roadways. This study provides the laboratory testing design and theoretical prediction of large diameter FRP bolts used for rib support in large deformation roadways.展开更多
The research on the mechanism of pile-soil-cap-goaf interaction and settlement of high-speed railway bridge located in mined-out area is still relatively rare. By taking the pile group of Guanshandi bridge foundation ...The research on the mechanism of pile-soil-cap-goaf interaction and settlement of high-speed railway bridge located in mined-out area is still relatively rare. By taking the pile group of Guanshandi bridge foundation in Hefei- Fuzhou high-speed railway as the prototype, a model test is carried out. According to the similarity theory, the similar constant is derived and the similar model material is determined. Meanwhile, three types of data including the bearing behavior of piles, and the settlement law, and soil among piles are investigated. It can be found that: the influence of goaf on the bearing capacity of pile is inversely to the loading degree, the larger of loading degree, the smaller impact of goaf on the bearing capacity. There is no negative side friction can been found in pile body and the degree of downward tendency for the barycenter of side friction layout is obvious for piles in goaf. Although the bearing ratio of soil resistance under cap is relatively large, the cap effect is suggested be ignored considering the characteristic of goaf. There is a maximum critical value for the uneven settlement of pile group in goaf, and when the value is reached, the uneven settlement stop growing anymore. In addition, the formula for calculating bearing capacity and settlement of pile group in goaf based on test results, theory analysis and related standard is established.展开更多
Land degradation caused by surface mining of gold has been extensive in Ghana. In recent years rehabilitation of some degraded lands by re-vegetation has been undertaken. This study provides quantitative data on the q...Land degradation caused by surface mining of gold has been extensive in Ghana. In recent years rehabilitation of some degraded lands by re-vegetation has been undertaken. This study provides quantitative data on the quality of some rehabilitated and un-rehabilitated mined soils within the AngloGold-Ashanti gold concession in parts of the semi-deciduous forest zone of Ghana. Soil properties determined included texture, bulk density and aggregate stability, pH, organic carbon, available phosphorus, total nitrogen, cation exchange capacity, exchangeable bases, exchange acidity, Fe, Mn, Ni, Cu, Zn, Cd, and Pb. Aggregate stability as a physical quality indicator revealed that aggregates of the rehabilitated mined soil had become more stable and similar to the control unmined soil due to litter and carbon additions from planted trees. The nutrient levels were very low because of the presence of low activity clays inherent in the native soil. Organic carbon content in the rehabilitated soil had increased above that of the unrehabilitated soil. Variability in soil properties, especially organic carbon and aggregate stability, was minimal in the unmined and rehabilitated soils implying that soils at the two sites were most robust and resistant to crushing and rupture. Quality index of the unmined control soil was 36.5% indicating that the quality of the soil was 63.5% relative to the optimum quality because of inherent poor soil properties. The mined rehabilitated and unrehabilitated soil had index values of 32.5% and 24.4 %, respectively. The marginal difference of 4% in soil quality between the control and rehabilitated soil shows that it is possible to maintain the health of soils with inherent physical and biochemical deficiencies if reclamation regulations are adhered to. In this way, the socio-economic dilemma of exploiting natural resources for the benefit of societies is ameliorated while maintaining an ecosystem balance.展开更多
Stability assessment is one of the most important issues in mining ground control. Mine development and/or production instability can cause production delay, loss of reserves, as well as injury to miners. Within the s...Stability assessment is one of the most important issues in mining ground control. Mine development and/or production instability can cause production delay, loss of reserves, as well as injury to miners. Within the scope of this study, a series of open stope’s instability under the influence of overlaying mined-out regions were carried out with different mining scenarios at Modi Taung gold mine which is operated by National Prosperity Gold Production Group Limited (NPGPGL) in Myanmar. NPGPGL has been developing stopes up to 150 m from the surface at Shwesin vein system, and the mining activities are going to continue to deeper levels to fulfill the ore mineral supply. Creating a new stope opening under overlaying mined-out regions is not easy considering the instability of mined-out regions can affect the stope. The instability of new stope opening is not only due to its own induced stress but also the strong influence by the mined-out regions situated on upper part of the stope. Therefore, the understandings of ground behaviors and failure mechanisms of new stope opening due to the influence of overlaying mined-out regions are paramount to be studied. This paper describes in detail the strength factor and failure zones under the overlaying mined-out regions with different mine conditions by using numerical simulations, 3D finite difference software (FLAC 3D).展开更多
By 2004, the occupied and disturbed land area had reached 3.393 million ha by mining, of which forest land took 532 000 ha; In addition, mining also caused 3.721 million -5.316 million ha of degraded forests and woodl...By 2004, the occupied and disturbed land area had reached 3.393 million ha by mining, of which forest land took 532 000 ha; In addition, mining also caused 3.721 million -5.316 million ha of degraded forests and woodlands. The impact of mining on environment is multi-fold and deep. Thus it is necessary and significant to approach effective methods to speed up vegetation restoration in abandoned mined lands. Phytoremediation is a relatively new technology (in the lastest decade) and the numbers of plant species have been identified to accumulate high levels of heavy metals, which implies that phytoremediation is available, practical and effective. Thereby the main procedure of ecosystem restoration in abandoned mined lands by mean of phytoremediation is discussed in the paper, such as site preparation, species selection, planting techniques, maintenance and tending methods.展开更多
Dikko area, Niger State, North Central Nigeria falls within the Pan-African thermo-tectonic event which occurred in Nigeria as in other parts of West Africa with widespread effect on the mineralization of rejuvenated ...Dikko area, Niger State, North Central Nigeria falls within the Pan-African thermo-tectonic event which occurred in Nigeria as in other parts of West Africa with widespread effect on the mineralization of rejuvenated basement and geosynclinal trough deposits. The Pan-African Belt in Nigeria forms part of the Benin-Nigeria (Dahomeyan) shield which is regarded as the southern prolongation of the circumcratonic Pan-African belt of the West African Craton. Structurally controlled, gold-bearing quartz veins were measured and studied in the area from an extensive geological ground investigation. Field and petrographical studies indicate that the Neoproterozoic rocks constitute gneisses, amphibolite schist, amphibolites and migmatites. The amphibolites are intruded by pegmatites. The associated quartz veins are generally concordant with the main N</span></span><span><span><span>-</span></span></span><span><span><span>S regional structural trend. The lithological and structural studies carried out in these areas have demonstrated the relationship between structures and mineralization and/or lithology. The main characteristics of the gold mineralization in the area appear to indicate hydrothermal mineralization in connection with shear zones. This study allows us to predict that quartz veins in the amphibolite can be mined at a profit and a detailed geochemical and resource valuation needs to be carried out for the Au and associated Galena and Ag mineralization to fully exploit their economic potential.展开更多
An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information a...An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL.展开更多
基金supported by the 111 Project (No.B07028)the Project for New Century Talents of Ministry of Education of China (No.NCET-04-0487)supported by the Natural Science Foundation of Jiangsu Province of China (No.50574095)
文摘The environmental challenges from coal mining include coal mine accidents,land subsidence,damage to the water environment,mining waste disposal and air pollution.These are either environmental pollution or landscape change.A conceptual framework for solving mine environmental issues is proposed.Clean processes,or remediation measures,are designed to address environmental pollution.Restoration measures are proposed to handle landscape change.The total methane drainage from 56 Chinese high methane concentration coal mines is about 101.94 million cubic meters.Of this methane,19.32 million,35.58 million and 6.97 million cubic meters are utilized for electricity generation,civil fuel supplies and other industrial purposes,respectively.About 39% of the methane is emitted into the atmosphere.The production of coal mining wastes can be decreased 10% by reuse of mining wastes as underground fills,or by using the waste as fuel for power plants or for raw material to make bricks or other infrastructure materials.The proper use of mined land must be decided in terms of local physical and socio-economical conditions.In European countries more than 50% of previously mined lands are reclaimed as forest or grass lands.However,in China more than 70% of the mined lands are reclaimed for agricultural purposes because the large population and a shortage of farmlands make this necessary.Reconstruction of rural communities or native residential improvement is one environmental problem arising from mining.We suggest two ways to reconstruct a farmer's house in China.
文摘Ⅰ. INTRODUCTION Bednorz and Müller have discovered possible superconductivity around 35K in Ba-La-Cu-O systems. Uchida and Takagi et al. have observed Meissner effect and determined superconductivity in the system. Within a few months, several groups have reported their successful results. Chu et al. pushed the T_c(onset) of Ba-La-Cu-O to 52K under hydrostatic pressure. Cava et al. obtained nearly single superconducting phase
基金Project (50490272) supported by the National Natural Science Foundation of China project(NCET-05-0687) supportedby Programfor New Century Excellent Talents project (040109) supported bythe Doctor Degree Paper Innovation Engineering of CentralSouth University
文摘Dynamic analysis steps and general flow of fast lagrangian analysis of continua in 3 dimensions(FLAC3D) were discussed. Numerical simulation for influence of excavation and blasting vibration on stability of mined-out area was carried out with FLAC3D. The whole analytical process was divided into two steps, including the static analysis and the dynamic analysis which were used to simulate the influence of excavation process and blasting vibration respectively. The results show that the shape of right upper boundary is extremely irregular after excavation, and stress concentration occurs at many places and higher tensile stress appears. The maximum tensile stress is higher than the tensile strength of rock mass, and surrounding rock of right roof will be damaged with tension fracture. The maximum displacement of surrounding rock is 4.75 mm after excavation. However, the maximum displacement increases to 5.47 mm after the blasting dynamic load is applied. And the covering area of plastic zones expands obviously, especially at the foot of right upper slope. The analytical results are in basic accordance with the observed results on the whole. Damage and disturbance on surrounding rock to some degree are caused by excavation, while blasting dynamic load increases the possibility of occurrence of dynamic instability and destruction further. So the effective supporting and vibration reducing measures should be taken during mining.
基金supported by the Key Program of the National Natural Science Foundation of China (No. 50334060)
文摘The surface subsidence is a common environmental hazard in mined-out area. Based on careful analysis of the regularity of surface subsidence in mined-out area, we proposed a new time function based on Harris curve model in consideration of the shortage of current surface subsidence time functions. By analyzing the characteristics of the new time function, we found that it could meet the dynamic process, the velocity change process and the acceleration change process during surface subsidence. Then its rationality had been verified through project cases. The results show that the proposed time function model can give a good reflection of the regularity of surface subsidence in mined-out area and can accurately predict surface subsidence. And the prediction data of the model are a little greater than measured data on condition of proper measured data quantity, which is safety in the engineering. This model provides a new method for the analysis of surface subsidence in mined-out area and reference for future prediction, and it is valuable to engineering application.
基金This work was financially supported by the Natural Science Foundation of Shannxi Province (No.2003E_213 )the Doctoral Foundation of the Ministry of Education of China (No.20020008021)the National Natural Science Foundation of China (No.50074002)
文摘Rock mass is fractured media. Its fracture is a nonlinear process. Theaccumulation of acoustic emission (AF) is closely related to the degree of damage. The dynamicsproblem is simply described based on the non-equilibrium statistical theory of crack evolvement,trying to use the hybrid analysis of the statistical theory and scan electron microscopy (SEM), thecharacters of AE signals from rock damage in a mined-out area is synthetically analyzed andevaluated. These provide an evidence to reverse deduce and accurately infer the position of rockfracture for dynamical hazard control.
基金Project(2012BAK09B02-05)supported by the National"Twelfth Five"Science and Technology Support Program,ChinaProject(51274250)supported by the National Natural Science Foundation of China+2 种基金Project(2013zzts057)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(11KF02)supported by the Research Fund of the State Key Laboratory of Coal Resources and Mine safety,CUMT,ChinaProject(2012M511417)supported by China Postdoctoral Science Foundation
文摘There were differences between real boundary and blast hole controlling boundary of irregular mined-out area in underground metal mines. There were errors in numerical analysis of stability for goaf, if it was analyzed as regular 3D mined-out area and the influence of coupling stress-seepage-disturbance was not considered adequately. Taking a lead zinc mine as the background, the model was built by the coupling of Surpac and Midas-Gts based on the goaf model precisely measured by CMS.According to seepage stress fundamental equations based on the equivalent continuum mechanical and the theory about equivalent load of dynamic disturbance in deep-hole blasting, the stability of mined-out area under multi-field coupling of stress-seepage-dynamic disturbance was numerically analyzed. The results show that it is more consistent between the numerical analysis model based on the real model of irregular 3D shape goaf and the real situation, which could faithfully reappear the change rule of stress–strain about the surrounding rock under synthetic action of blasting dynamic loading and the seepage pressure. The mined-out area multi-field coupling formed by blasting excavation is stable. Based on combination of the advantages of the CMS,Surpac and Midas-Gts, and fully consideration of the effects of multi-field coupling, the accurate and effective way could be provided for numerical analysis of stability for mined-out area.
基金This work was financially supported by the National Natural Science Foundation of China (No. 10402033) and the Key Lab. Foun-dation of the Ministry of Education of China (No.04JS19).
文摘The engineering and geological characteristics of a steep slope consisting of coal gangue, rock and soil medium in Huating coal mine have been comprehensively investigated. Owing to humid weather, heavy rainfall, vegetation and porous characteristics of the soil and rock mass, the steep slope will be destabilized and induce mud-rock flow or derive hazard easily. Firstly, based on the classical slope reinforcement theory, some regularity between the shear and displacement in the destabilized zone of the slope with or without root strength contribution is presented. Then, based on the experimental and statistical analysis of root strength, hydrological characteristics and stability status, etc., some possible biotechnical techniques for reinforcement of the steep slope have been suggested. These methods are important for quantitative analysis of destabilization of the slope and design of the biotechnical reinforcement.
基金financially supported by the National"Twelfth-Five-Year"Science&Technology Support Plan(No.2012BAK09B02-05)the National Natural Science Foundation of China(No.51274250)
文摘To identify the instability on large scale underground mined-out area in the metal mine effectively,the parameters of radial basis function were determined through clustering method and the improved fuzzy radial basis function neural network(FRBFNN)model of instability identification model about large scale underground mined-out area in the metal mine was built.The improved FRBFNN model was trained and tested.The results show that the improved FRBFNN model has high training accuracy and generalization ability.Parameters such as pillar area ratio,filling level and the value of rock quality designation have strong influence on instability of large scale underground mined-out area.Correctness of analysis about the improved FRBFNN model was proved by the practical application results about instability discrimination of surrounding rock in large-scale underground mined-out area of a metal mine in south China.
基金The work presented in this paper was financially jointly supported by General Project of the National Natural Science Foundation of China(No.52074145)Liaoning Revitalization Talents Program(No.XLYC2002110).
文摘In underground coal mines, fibre reinforced polymer(FRP) bolt is ideal for mined rib reinforcements as it can prevent gas explosions caused by shearer frictional spark. With increasing mining depth, small diameter FRP bolts used in shallow underground mining cannot fulfil the rib support requirements. Under the engineering background of deep underground shortwall mining in Wudong coal mine, this paper systematically studies Φ27 mm FRP bolt support for large deformation coal rib. Specimens with a fan-shaped cross-section were used to enable the tensile testing of the bolt rod, the measured average tensile strength of the studied FRP bolt was(486.1 ± 9.6) MPa with a maximum elongation of 5.7%±0.6%.The shear strength of the bolt was measured as approximately 258 MPa using a self-made double shear testing apparatus. Based on the equivalent radial stiffness principle, a laboratory short encapsulation pullout test(SEPT) method for rib bolting has been developed undertaken consideration of the mechanical properties of the coal seam. Results showed that the average peak anchorage forces of the Φ27 mm FRP bolt and Φ20 mm steel rebar bolt were 108.4 and 66.4 k N, respectively, which were agreed with the theoretical calculations and field measurements. Based on theoretical analysis of the loading states of the bolt under site conditions, bolting method of full-length resin grouting was adopted to offset the weaknesses of the FRP bolt. Numerical method was employed to compare the bolting effect using Φ27 mm FRP bolts and steel rebar bolts. Large diameter FRP bolting was determined as the optimum rib support scheme to increase the productivity of the coal mine and to enhance the ground control capability for+425 level mining roadways. This study provides the laboratory testing design and theoretical prediction of large diameter FRP bolts used for rib support in large deformation roadways.
文摘The research on the mechanism of pile-soil-cap-goaf interaction and settlement of high-speed railway bridge located in mined-out area is still relatively rare. By taking the pile group of Guanshandi bridge foundation in Hefei- Fuzhou high-speed railway as the prototype, a model test is carried out. According to the similarity theory, the similar constant is derived and the similar model material is determined. Meanwhile, three types of data including the bearing behavior of piles, and the settlement law, and soil among piles are investigated. It can be found that: the influence of goaf on the bearing capacity of pile is inversely to the loading degree, the larger of loading degree, the smaller impact of goaf on the bearing capacity. There is no negative side friction can been found in pile body and the degree of downward tendency for the barycenter of side friction layout is obvious for piles in goaf. Although the bearing ratio of soil resistance under cap is relatively large, the cap effect is suggested be ignored considering the characteristic of goaf. There is a maximum critical value for the uneven settlement of pile group in goaf, and when the value is reached, the uneven settlement stop growing anymore. In addition, the formula for calculating bearing capacity and settlement of pile group in goaf based on test results, theory analysis and related standard is established.
文摘Land degradation caused by surface mining of gold has been extensive in Ghana. In recent years rehabilitation of some degraded lands by re-vegetation has been undertaken. This study provides quantitative data on the quality of some rehabilitated and un-rehabilitated mined soils within the AngloGold-Ashanti gold concession in parts of the semi-deciduous forest zone of Ghana. Soil properties determined included texture, bulk density and aggregate stability, pH, organic carbon, available phosphorus, total nitrogen, cation exchange capacity, exchangeable bases, exchange acidity, Fe, Mn, Ni, Cu, Zn, Cd, and Pb. Aggregate stability as a physical quality indicator revealed that aggregates of the rehabilitated mined soil had become more stable and similar to the control unmined soil due to litter and carbon additions from planted trees. The nutrient levels were very low because of the presence of low activity clays inherent in the native soil. Organic carbon content in the rehabilitated soil had increased above that of the unrehabilitated soil. Variability in soil properties, especially organic carbon and aggregate stability, was minimal in the unmined and rehabilitated soils implying that soils at the two sites were most robust and resistant to crushing and rupture. Quality index of the unmined control soil was 36.5% indicating that the quality of the soil was 63.5% relative to the optimum quality because of inherent poor soil properties. The mined rehabilitated and unrehabilitated soil had index values of 32.5% and 24.4 %, respectively. The marginal difference of 4% in soil quality between the control and rehabilitated soil shows that it is possible to maintain the health of soils with inherent physical and biochemical deficiencies if reclamation regulations are adhered to. In this way, the socio-economic dilemma of exploiting natural resources for the benefit of societies is ameliorated while maintaining an ecosystem balance.
文摘Stability assessment is one of the most important issues in mining ground control. Mine development and/or production instability can cause production delay, loss of reserves, as well as injury to miners. Within the scope of this study, a series of open stope’s instability under the influence of overlaying mined-out regions were carried out with different mining scenarios at Modi Taung gold mine which is operated by National Prosperity Gold Production Group Limited (NPGPGL) in Myanmar. NPGPGL has been developing stopes up to 150 m from the surface at Shwesin vein system, and the mining activities are going to continue to deeper levels to fulfill the ore mineral supply. Creating a new stope opening under overlaying mined-out regions is not easy considering the instability of mined-out regions can affect the stope. The instability of new stope opening is not only due to its own induced stress but also the strong influence by the mined-out regions situated on upper part of the stope. Therefore, the understandings of ground behaviors and failure mechanisms of new stope opening due to the influence of overlaying mined-out regions are paramount to be studied. This paper describes in detail the strength factor and failure zones under the overlaying mined-out regions with different mine conditions by using numerical simulations, 3D finite difference software (FLAC 3D).
基金This research is one part of the National Research Institution Fund (RISF2006-2007-07)National Scientific & TechnologicalSupport Project (No.2006BAD03A15)0Zhejiang Provincial Key Scientific & Technological Project (No.2004C12030) and(No.2005C13003).
文摘By 2004, the occupied and disturbed land area had reached 3.393 million ha by mining, of which forest land took 532 000 ha; In addition, mining also caused 3.721 million -5.316 million ha of degraded forests and woodlands. The impact of mining on environment is multi-fold and deep. Thus it is necessary and significant to approach effective methods to speed up vegetation restoration in abandoned mined lands. Phytoremediation is a relatively new technology (in the lastest decade) and the numbers of plant species have been identified to accumulate high levels of heavy metals, which implies that phytoremediation is available, practical and effective. Thereby the main procedure of ecosystem restoration in abandoned mined lands by mean of phytoremediation is discussed in the paper, such as site preparation, species selection, planting techniques, maintenance and tending methods.
文摘Dikko area, Niger State, North Central Nigeria falls within the Pan-African thermo-tectonic event which occurred in Nigeria as in other parts of West Africa with widespread effect on the mineralization of rejuvenated basement and geosynclinal trough deposits. The Pan-African Belt in Nigeria forms part of the Benin-Nigeria (Dahomeyan) shield which is regarded as the southern prolongation of the circumcratonic Pan-African belt of the West African Craton. Structurally controlled, gold-bearing quartz veins were measured and studied in the area from an extensive geological ground investigation. Field and petrographical studies indicate that the Neoproterozoic rocks constitute gneisses, amphibolite schist, amphibolites and migmatites. The amphibolites are intruded by pegmatites. The associated quartz veins are generally concordant with the main N</span></span><span><span><span>-</span></span></span><span><span><span>S regional structural trend. The lithological and structural studies carried out in these areas have demonstrated the relationship between structures and mineralization and/or lithology. The main characteristics of the gold mineralization in the area appear to indicate hydrothermal mineralization in connection with shear zones. This study allows us to predict that quartz veins in the amphibolite can be mined at a profit and a detailed geochemical and resource valuation needs to be carried out for the Au and associated Galena and Ag mineralization to fully exploit their economic potential.
文摘An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL.